PERANCANGAN SISTEM PENYALIRAN TAMBANG BATUBARA DI PT BHUMI RANTAU ENERGI PROVINSI KALIMANTAN SELATAN

PT Bhumi Rantau Energi mine site is located on the west side of northeast-tosouthwest-bearing crest, which is dividing local catchment area into 2 main catchment areas: western catchment area and eastern catchment area. Runoff generated by sub-catchments of western catchment area will flow towards...

Full description

Saved in:
Bibliographic Details
Main Author: Badhurahman, Abie
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/50560
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:50560
spelling id-itb.:505602020-09-24T15:10:18ZPERANCANGAN SISTEM PENYALIRAN TAMBANG BATUBARA DI PT BHUMI RANTAU ENERGI PROVINSI KALIMANTAN SELATAN Badhurahman, Abie Indonesia Final Project sub-catchment, runoff flow, mine drainage, mine dewatering, sedimentation pond INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/50560 PT Bhumi Rantau Energi mine site is located on the west side of northeast-tosouthwest-bearing crest, which is dividing local catchment area into 2 main catchment areas: western catchment area and eastern catchment area. Runoff generated by sub-catchments of western catchment area will flow towards mine opening. A comprehensive designing of mine drainage system is necessary, not only to direct runoff flow from sub-catchments located eastward mine opening and in-pit runoff into natural stream on the west side of mine location but also to comply effluent with water quality standards. Mine drainage system designing conducted in PT Bhumi Rantau Energi which is based on yearly mine plan from 2014 to 2018, consists of 3 integral parts, i.e.: drainage design (open channel and culvert), mine dewatering (sump and pumping system) and water quality control (sedimentation pond) Open channel is categorized into two main classes based on its function: main open channel and diverting channel. Diverting channels are designed at pit Cendana to deal with surface runoff flowing into pit. Main open channel system comprises of several sections, which have dimensions related with total area of catchments served. In 2014, there are five sections made in one water-course way. From 2015 until 2018, main open channel system is made into seven sections which are divided into two water-course ways: western water-course way and eastern water-course way. Culvert is designed under waste dump Rinjani roadway as a water-flow control. Mine dewatering is served by operating two different types of pump, i.e. Multiflo MF 385 HP and MF 420, which are stationed at five sumps inside pit Cendana and pit Mahoni using eight different scenarios of operation. Mine water treatment is planned by utilizing eight ponds to deal with sedimentation of silt-sized suspended colloid particles with pond surface areas are ranging from 2500m2 to 40 000 m2 . The mine drainage system design is expected to support mine operation in PT Bhumi Rantau Energi from 2014 to 2018 trough best-practicing of runoff-flow directing plan and water-treatment plan in order to minimize negative impacts towards local environment surrounding the mine site. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Bhumi Rantau Energi mine site is located on the west side of northeast-tosouthwest-bearing crest, which is dividing local catchment area into 2 main catchment areas: western catchment area and eastern catchment area. Runoff generated by sub-catchments of western catchment area will flow towards mine opening. A comprehensive designing of mine drainage system is necessary, not only to direct runoff flow from sub-catchments located eastward mine opening and in-pit runoff into natural stream on the west side of mine location but also to comply effluent with water quality standards. Mine drainage system designing conducted in PT Bhumi Rantau Energi which is based on yearly mine plan from 2014 to 2018, consists of 3 integral parts, i.e.: drainage design (open channel and culvert), mine dewatering (sump and pumping system) and water quality control (sedimentation pond) Open channel is categorized into two main classes based on its function: main open channel and diverting channel. Diverting channels are designed at pit Cendana to deal with surface runoff flowing into pit. Main open channel system comprises of several sections, which have dimensions related with total area of catchments served. In 2014, there are five sections made in one water-course way. From 2015 until 2018, main open channel system is made into seven sections which are divided into two water-course ways: western water-course way and eastern water-course way. Culvert is designed under waste dump Rinjani roadway as a water-flow control. Mine dewatering is served by operating two different types of pump, i.e. Multiflo MF 385 HP and MF 420, which are stationed at five sumps inside pit Cendana and pit Mahoni using eight different scenarios of operation. Mine water treatment is planned by utilizing eight ponds to deal with sedimentation of silt-sized suspended colloid particles with pond surface areas are ranging from 2500m2 to 40 000 m2 . The mine drainage system design is expected to support mine operation in PT Bhumi Rantau Energi from 2014 to 2018 trough best-practicing of runoff-flow directing plan and water-treatment plan in order to minimize negative impacts towards local environment surrounding the mine site.
format Final Project
author Badhurahman, Abie
spellingShingle Badhurahman, Abie
PERANCANGAN SISTEM PENYALIRAN TAMBANG BATUBARA DI PT BHUMI RANTAU ENERGI PROVINSI KALIMANTAN SELATAN
author_facet Badhurahman, Abie
author_sort Badhurahman, Abie
title PERANCANGAN SISTEM PENYALIRAN TAMBANG BATUBARA DI PT BHUMI RANTAU ENERGI PROVINSI KALIMANTAN SELATAN
title_short PERANCANGAN SISTEM PENYALIRAN TAMBANG BATUBARA DI PT BHUMI RANTAU ENERGI PROVINSI KALIMANTAN SELATAN
title_full PERANCANGAN SISTEM PENYALIRAN TAMBANG BATUBARA DI PT BHUMI RANTAU ENERGI PROVINSI KALIMANTAN SELATAN
title_fullStr PERANCANGAN SISTEM PENYALIRAN TAMBANG BATUBARA DI PT BHUMI RANTAU ENERGI PROVINSI KALIMANTAN SELATAN
title_full_unstemmed PERANCANGAN SISTEM PENYALIRAN TAMBANG BATUBARA DI PT BHUMI RANTAU ENERGI PROVINSI KALIMANTAN SELATAN
title_sort perancangan sistem penyaliran tambang batubara di pt bhumi rantau energi provinsi kalimantan selatan
url https://digilib.itb.ac.id/gdl/view/50560
_version_ 1822000692998438912