EVALUASI STRATEGI IMPLEMENTASI TERTIARY RECOVERY PADA LAPANGAN MINYAK LIMAU : Aspek Teknis Dan Finansial
</i><b>Abstract: <i></b><p align="justify"> Limau Oil Field is one of Pertamina's old oil Field situated at Prabumulih area, South Sumatra. This field was discovered in 1940's, it's fully developed and produced with primary method, peak producti...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/5085 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:5085 |
---|---|
spelling |
id-itb.:50852006-09-28T08:56:06ZEVALUASI STRATEGI IMPLEMENTASI TERTIARY RECOVERY PADA LAPANGAN MINYAK LIMAU : Aspek Teknis Dan Finansial Arya A. I. Hartoko<br> NIM. 281 98 015, Hasta Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/5085 </i><b>Abstract: <i></b><p align="justify"> Limau Oil Field is one of Pertamina's old oil Field situated at Prabumulih area, South Sumatra. This field was discovered in 1940's, it's fully developed and produced with primary method, peak production was reached on 1960's with 30,000 BOPD and then gradually decreased. Last production rate on 1989 less than 2,000 BOPD.<p align="justify"> Enhance Oil Recovery Contract between Pertamina and Contractor was signed on 1989 and Joint Operating Body (JOB) Pertamina Seaunion Energy Limau Ltd was formed.<p align="justify"> JOB implemented "secondary recovery technology" by water flood method , as a result Limau production rate improved to 7200 BOPD in 1999. But after that production rate tend to decrease and will continue decrease constantly with 25 % decline rate. With current technology the life time of this field only until 2006.<p align="justify"> With "tertiary recovery technology" implementation, 24.8 million barrel additional proven, reserve will be gain and this field can keep produce oil economically until 2014.</p> text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
</i><b>Abstract: <i></b><p align="justify"> Limau Oil Field is one of Pertamina's old oil Field situated at Prabumulih area, South Sumatra. This field was discovered in 1940's, it's fully developed and produced with primary method, peak production was reached on 1960's with 30,000 BOPD and then gradually decreased. Last production rate on 1989 less than 2,000 BOPD.<p align="justify"> Enhance Oil Recovery Contract between Pertamina and Contractor was signed on 1989 and Joint Operating Body (JOB) Pertamina Seaunion Energy Limau Ltd was formed.<p align="justify"> JOB implemented "secondary recovery technology" by water flood method , as a result Limau production rate improved to 7200 BOPD in 1999. But after that production rate tend to decrease and will continue decrease constantly with 25 % decline rate. With current technology the life time of this field only until 2006.<p align="justify"> With "tertiary recovery technology" implementation, 24.8 million barrel additional proven, reserve will be gain and this field can keep produce oil economically until 2014.</p> |
format |
Theses |
author |
Arya A. I. Hartoko<br> NIM. 281 98 015, Hasta |
spellingShingle |
Arya A. I. Hartoko<br> NIM. 281 98 015, Hasta EVALUASI STRATEGI IMPLEMENTASI TERTIARY RECOVERY PADA LAPANGAN MINYAK LIMAU : Aspek Teknis Dan Finansial |
author_facet |
Arya A. I. Hartoko<br> NIM. 281 98 015, Hasta |
author_sort |
Arya A. I. Hartoko<br> NIM. 281 98 015, Hasta |
title |
EVALUASI STRATEGI IMPLEMENTASI TERTIARY RECOVERY PADA LAPANGAN MINYAK LIMAU : Aspek Teknis Dan Finansial |
title_short |
EVALUASI STRATEGI IMPLEMENTASI TERTIARY RECOVERY PADA LAPANGAN MINYAK LIMAU : Aspek Teknis Dan Finansial |
title_full |
EVALUASI STRATEGI IMPLEMENTASI TERTIARY RECOVERY PADA LAPANGAN MINYAK LIMAU : Aspek Teknis Dan Finansial |
title_fullStr |
EVALUASI STRATEGI IMPLEMENTASI TERTIARY RECOVERY PADA LAPANGAN MINYAK LIMAU : Aspek Teknis Dan Finansial |
title_full_unstemmed |
EVALUASI STRATEGI IMPLEMENTASI TERTIARY RECOVERY PADA LAPANGAN MINYAK LIMAU : Aspek Teknis Dan Finansial |
title_sort |
evaluasi strategi implementasi tertiary recovery pada lapangan minyak limau : aspek teknis dan finansial |
url |
https://digilib.itb.ac.id/gdl/view/5085 |
_version_ |
1820663583013339136 |