USULAN METODE PENJADWALAN PERMINTAAN PEKERJAAN ( WO ) PEMELIHARAAN ( STUDI KASUS PT. PJB UHAR GRESIK )

<b></i>Abstract : </b><i><p align=\"justify\"> <br /> The maintenance of the power plan in PT PJB Unit Pembangkitan Gresik ( UP. Gresik) is the responsibility of PT PJB Unit Bisnis Pemeliharaan Gresik ( UHAR Gresik ). The maintenance activity is divided...

Full description

Saved in:
Bibliographic Details
Main Author: Subekti (NIM 28199013), Kasbullah
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/5108
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:5108
spelling id-itb.:51082006-12-22T08:18:43ZUSULAN METODE PENJADWALAN PERMINTAAN PEKERJAAN ( WO ) PEMELIHARAAN ( STUDI KASUS PT. PJB UHAR GRESIK ) Subekti (NIM 28199013), Kasbullah Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/5108 <b></i>Abstract : </b><i><p align=\"justify\"> <br /> The maintenance of the power plan in PT PJB Unit Pembangkitan Gresik ( UP. Gresik) is the responsibility of PT PJB Unit Bisnis Pemeliharaan Gresik ( UHAR Gresik ). The maintenance activity is divided into 2 categories : <br /> <p align=\"justify\">a. Planned maintenance, which includes : preventive, predictive, overhaul, and modification. <br /> <p align=\"justify\">b. Unplanned maintenance, which includes : corrective, emergency, and breakdown maintenance <br /> <p align=\"justify\">The main problem in maintenance at UP Gresik Power Plan for the last 3 years has been inability to meet the performance indicators, such as the number of finished work order (WO) per month, delay time for finishing WO, and productivity finishing WO per maintenance crew. This problem is indicated by the high number of WO backlog and the low number of productivity. This will in turn cause the increased number of troubles per unit from time to time. <br /> <p align=\"justify\">One major cause for WO backlog is the lack of planning and scheduling for finishing WO backlog which issued by UHAR Gresik. Apart from that, other causes are the lack of control and inflexible of job distribution among maintenance crews. <br /> <p align=\"justify\">To solve the problem and to increase the performance of UHAR Gresik, following measures are proposed : introduction of a new method for planning and scheduling for finishing WO backlog, controlling and monitoring of WO, human resource allocation according to the scope of work and loading for finishing WO, and also a flexible job distribution for crews. <br /> <p align=\"justify\">The implementation of the proposed method and concept would bring some benefits which includes the reduction of WO backlog, minimum number of idle maintenance crew, and increase productivity. Apart from that, the planning and scheduling WO would indirectly increase the capability of UP. Gresik. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <b></i>Abstract : </b><i><p align=\"justify\"> <br /> The maintenance of the power plan in PT PJB Unit Pembangkitan Gresik ( UP. Gresik) is the responsibility of PT PJB Unit Bisnis Pemeliharaan Gresik ( UHAR Gresik ). The maintenance activity is divided into 2 categories : <br /> <p align=\"justify\">a. Planned maintenance, which includes : preventive, predictive, overhaul, and modification. <br /> <p align=\"justify\">b. Unplanned maintenance, which includes : corrective, emergency, and breakdown maintenance <br /> <p align=\"justify\">The main problem in maintenance at UP Gresik Power Plan for the last 3 years has been inability to meet the performance indicators, such as the number of finished work order (WO) per month, delay time for finishing WO, and productivity finishing WO per maintenance crew. This problem is indicated by the high number of WO backlog and the low number of productivity. This will in turn cause the increased number of troubles per unit from time to time. <br /> <p align=\"justify\">One major cause for WO backlog is the lack of planning and scheduling for finishing WO backlog which issued by UHAR Gresik. Apart from that, other causes are the lack of control and inflexible of job distribution among maintenance crews. <br /> <p align=\"justify\">To solve the problem and to increase the performance of UHAR Gresik, following measures are proposed : introduction of a new method for planning and scheduling for finishing WO backlog, controlling and monitoring of WO, human resource allocation according to the scope of work and loading for finishing WO, and also a flexible job distribution for crews. <br /> <p align=\"justify\">The implementation of the proposed method and concept would bring some benefits which includes the reduction of WO backlog, minimum number of idle maintenance crew, and increase productivity. Apart from that, the planning and scheduling WO would indirectly increase the capability of UP. Gresik.
format Theses
author Subekti (NIM 28199013), Kasbullah
spellingShingle Subekti (NIM 28199013), Kasbullah
USULAN METODE PENJADWALAN PERMINTAAN PEKERJAAN ( WO ) PEMELIHARAAN ( STUDI KASUS PT. PJB UHAR GRESIK )
author_facet Subekti (NIM 28199013), Kasbullah
author_sort Subekti (NIM 28199013), Kasbullah
title USULAN METODE PENJADWALAN PERMINTAAN PEKERJAAN ( WO ) PEMELIHARAAN ( STUDI KASUS PT. PJB UHAR GRESIK )
title_short USULAN METODE PENJADWALAN PERMINTAAN PEKERJAAN ( WO ) PEMELIHARAAN ( STUDI KASUS PT. PJB UHAR GRESIK )
title_full USULAN METODE PENJADWALAN PERMINTAAN PEKERJAAN ( WO ) PEMELIHARAAN ( STUDI KASUS PT. PJB UHAR GRESIK )
title_fullStr USULAN METODE PENJADWALAN PERMINTAAN PEKERJAAN ( WO ) PEMELIHARAAN ( STUDI KASUS PT. PJB UHAR GRESIK )
title_full_unstemmed USULAN METODE PENJADWALAN PERMINTAAN PEKERJAAN ( WO ) PEMELIHARAAN ( STUDI KASUS PT. PJB UHAR GRESIK )
title_sort usulan metode penjadwalan permintaan pekerjaan ( wo ) pemeliharaan ( studi kasus pt. pjb uhar gresik )
url https://digilib.itb.ac.id/gdl/view/5108
_version_ 1822014984902672384