USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG
PT X is a company that specializes in manufacturing custom machines for the automotive industry (job shop). Generally, PT X schedules its operations by prioritizing tasks with the nearest deadlines. However, this method is unsuitable due to the variation in the required number and duration of all...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84157 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |