USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG
PT X is a company that specializes in manufacturing custom machines for the automotive industry (job shop). Generally, PT X schedules its operations by prioritizing tasks with the nearest deadlines. However, this method is unsuitable due to the variation in the required number and duration of all...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84157 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:84157 |
---|---|
spelling |
id-itb.:841572024-08-14T11:00:36ZUSULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG Rafael Haryadi, Fransiskus Indonesia Final Project scheduling, shifting bottleneck, makespan, rescheduling INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/84157 PT X is a company that specializes in manufacturing custom machines for the automotive industry (job shop). Generally, PT X schedules its operations by prioritizing tasks with the nearest deadlines. However, this method is unsuitable due to the variation in the required number and duration of all the processes. This can risk lowering PT X's service quality in the eyes of its customers. Additionally, the overall scheduling is still largely manual, which takes a significant amount of time. This manual process is also applied to handling new jobs, where the schedule is adjusted one by one in a repetitive manner. Historical data supports the existence of this problem, showing that 37% of jobs are delayed overall. Thus, finding a scheduling model to help PT X manage new jobs is urgent. Given this need, the study began by reviewing potential alternatives for implementation. The alternatives included the shifting bottleneck algorithm, particle swarm optimization algorithm, genetic algorithm, and mixed-integer programming (MIP). Each alternative was evaluated to identify the most suitable algorithm for PT X. Based on the comparison results; the shifting bottleneck algorithm appears to be the most appropriate for addressing PT X's needs. Consequently, the shifting bottleneck algorithm was chosen for detailed testing with PT X's historical data. The results of testing the shifting bottleneck algorithm showed a reduction in makespan by 13%, from an initial 10446.2 hours to 9086.7 hours in a standard case. Additionally, the makespan for rescheduling, which initially took 12163.3 hours, was reduced to 8908.1 hours, a reduction of 27%. Therefore, scheduling with the proposed adjusted algorithm proved to have a positive impact compared to PT X's existing scheduling method. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
PT X is a company that specializes in manufacturing custom machines for the
automotive industry (job shop). Generally, PT X schedules its operations by
prioritizing tasks with the nearest deadlines. However, this method is unsuitable due
to the variation in the required number and duration of all the processes. This can
risk lowering PT X's service quality in the eyes of its customers. Additionally, the
overall scheduling is still largely manual, which takes a significant amount of time.
This manual process is also applied to handling new jobs, where the schedule is
adjusted one by one in a repetitive manner. Historical data supports the existence
of this problem, showing that 37% of jobs are delayed overall. Thus, finding a
scheduling model to help PT X manage new jobs is urgent.
Given this need, the study began by reviewing potential alternatives for
implementation. The alternatives included the shifting bottleneck algorithm,
particle swarm optimization algorithm, genetic algorithm, and mixed-integer
programming (MIP). Each alternative was evaluated to identify the most suitable
algorithm for PT X. Based on the comparison results; the shifting bottleneck
algorithm appears to be the most appropriate for addressing PT X's needs.
Consequently, the shifting bottleneck algorithm was chosen for detailed testing with
PT X's historical data.
The results of testing the shifting bottleneck algorithm showed a reduction in
makespan by 13%, from an initial 10446.2 hours to 9086.7 hours in a standard
case. Additionally, the makespan for rescheduling, which initially took 12163.3
hours, was reduced to 8908.1 hours, a reduction of 27%. Therefore, scheduling with
the proposed adjusted algorithm proved to have a positive impact compared to PT
X's existing scheduling method.
|
format |
Final Project |
author |
Rafael Haryadi, Fransiskus |
spellingShingle |
Rafael Haryadi, Fransiskus USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG |
author_facet |
Rafael Haryadi, Fransiskus |
author_sort |
Rafael Haryadi, Fransiskus |
title |
USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG |
title_short |
USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG |
title_full |
USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG |
title_fullStr |
USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG |
title_full_unstemmed |
USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG |
title_sort |
usulan metode penjadwalan job shop di pt x menggunakan algoritma shifting bottleneck yang mengakomodasi penjadwalan ulang |
url |
https://digilib.itb.ac.id/gdl/view/84157 |
_version_ |
1822282742308536320 |