USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG

PT X is a company that specializes in manufacturing custom machines for the automotive industry (job shop). Generally, PT X schedules its operations by prioritizing tasks with the nearest deadlines. However, this method is unsuitable due to the variation in the required number and duration of all...

Full description

Saved in:
Bibliographic Details
Main Author: Rafael Haryadi, Fransiskus
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/84157
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:84157
spelling id-itb.:841572024-08-14T11:00:36ZUSULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG Rafael Haryadi, Fransiskus Indonesia Final Project scheduling, shifting bottleneck, makespan, rescheduling INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/84157 PT X is a company that specializes in manufacturing custom machines for the automotive industry (job shop). Generally, PT X schedules its operations by prioritizing tasks with the nearest deadlines. However, this method is unsuitable due to the variation in the required number and duration of all the processes. This can risk lowering PT X's service quality in the eyes of its customers. Additionally, the overall scheduling is still largely manual, which takes a significant amount of time. This manual process is also applied to handling new jobs, where the schedule is adjusted one by one in a repetitive manner. Historical data supports the existence of this problem, showing that 37% of jobs are delayed overall. Thus, finding a scheduling model to help PT X manage new jobs is urgent. Given this need, the study began by reviewing potential alternatives for implementation. The alternatives included the shifting bottleneck algorithm, particle swarm optimization algorithm, genetic algorithm, and mixed-integer programming (MIP). Each alternative was evaluated to identify the most suitable algorithm for PT X. Based on the comparison results; the shifting bottleneck algorithm appears to be the most appropriate for addressing PT X's needs. Consequently, the shifting bottleneck algorithm was chosen for detailed testing with PT X's historical data. The results of testing the shifting bottleneck algorithm showed a reduction in makespan by 13%, from an initial 10446.2 hours to 9086.7 hours in a standard case. Additionally, the makespan for rescheduling, which initially took 12163.3 hours, was reduced to 8908.1 hours, a reduction of 27%. Therefore, scheduling with the proposed adjusted algorithm proved to have a positive impact compared to PT X's existing scheduling method. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT X is a company that specializes in manufacturing custom machines for the automotive industry (job shop). Generally, PT X schedules its operations by prioritizing tasks with the nearest deadlines. However, this method is unsuitable due to the variation in the required number and duration of all the processes. This can risk lowering PT X's service quality in the eyes of its customers. Additionally, the overall scheduling is still largely manual, which takes a significant amount of time. This manual process is also applied to handling new jobs, where the schedule is adjusted one by one in a repetitive manner. Historical data supports the existence of this problem, showing that 37% of jobs are delayed overall. Thus, finding a scheduling model to help PT X manage new jobs is urgent. Given this need, the study began by reviewing potential alternatives for implementation. The alternatives included the shifting bottleneck algorithm, particle swarm optimization algorithm, genetic algorithm, and mixed-integer programming (MIP). Each alternative was evaluated to identify the most suitable algorithm for PT X. Based on the comparison results; the shifting bottleneck algorithm appears to be the most appropriate for addressing PT X's needs. Consequently, the shifting bottleneck algorithm was chosen for detailed testing with PT X's historical data. The results of testing the shifting bottleneck algorithm showed a reduction in makespan by 13%, from an initial 10446.2 hours to 9086.7 hours in a standard case. Additionally, the makespan for rescheduling, which initially took 12163.3 hours, was reduced to 8908.1 hours, a reduction of 27%. Therefore, scheduling with the proposed adjusted algorithm proved to have a positive impact compared to PT X's existing scheduling method.
format Final Project
author Rafael Haryadi, Fransiskus
spellingShingle Rafael Haryadi, Fransiskus
USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG
author_facet Rafael Haryadi, Fransiskus
author_sort Rafael Haryadi, Fransiskus
title USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG
title_short USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG
title_full USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG
title_fullStr USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG
title_full_unstemmed USULAN METODE PENJADWALAN JOB SHOP DI PT X MENGGUNAKAN ALGORITMA SHIFTING BOTTLENECK YANG MENGAKOMODASI PENJADWALAN ULANG
title_sort usulan metode penjadwalan job shop di pt x menggunakan algoritma shifting bottleneck yang mengakomodasi penjadwalan ulang
url https://digilib.itb.ac.id/gdl/view/84157
_version_ 1822282742308536320