SUSTAINABLE SAFE AND EFFICIENT WELL SERVICE PROGRAM FOR QUALITY EXECUTION
Electric submersible pump premature failure issues result to oil production deferment which led to oil sales revenue disruption, especially for a company whose concession right is limited by contractual agreement. Well service job will be executed to replace pump to return oil well back to product...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51151 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:51151 |
---|---|
spelling |
id-itb.:511512020-09-27T16:59:59ZSUSTAINABLE SAFE AND EFFICIENT WELL SERVICE PROGRAM FOR QUALITY EXECUTION Prasetya Utama, Ramadhan Manajemen umum Indonesia Theses well service, premature failure, electric submersible pump INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51151 Electric submersible pump premature failure issues result to oil production deferment which led to oil sales revenue disruption, especially for a company whose concession right is limited by contractual agreement. Well service job will be executed to replace pump to return oil well back to production. It is important to design well service job in order to have efficient and safe operation, with objective to extend pump run life as long as possible and avoid recurring cost of re-entry. Well service job itself is considered low risk but high in quantity which is required to be managed very carefully in alignment of cost spending efficiency. Research is conducted to find the root causes of premature pump failure and solution. As the control parameter, safety aspect shall always be maintained during well service job. Using DMAIC (Define Measure Analyze Improve Control) framework, the problems are studied with structured thinking process from the problem definition and measuring current process outcome based on official database of tear down analysis of electric submersible pump. It is continued with analyzing root causes of premature failures and alternatives of improvement are proposed. Root causes of majority premature pump failures are observed, which are solid interference; manufacturing and assembly; power disruption; improper pump design; installation practice. Best solution for each root cause is chosen by selecting attributes important for stakeholders and calculating overall weighed score of effectiveness, applicability, and production constraint. Business solution is implemented by dividing phase of pre-execution, execution, and post-execution and assigned responsible party for each phase. Solution is also differentiated between general solution and oil well specific solution to ensure effectiveness to problem solving. New business process will be planned before implementation, and continued improvement is to be done after reviewing the outcome of implementation. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum Prasetya Utama, Ramadhan SUSTAINABLE SAFE AND EFFICIENT WELL SERVICE PROGRAM FOR QUALITY EXECUTION |
description |
Electric submersible pump premature failure issues result to oil production deferment which led to oil
sales revenue disruption, especially for a company whose concession right is limited by contractual
agreement. Well service job will be executed to replace pump to return oil well back to production. It
is important to design well service job in order to have efficient and safe operation, with objective to
extend pump run life as long as possible and avoid recurring cost of re-entry. Well service job itself is
considered low risk but high in quantity which is required to be managed very carefully in alignment
of cost spending efficiency.
Research is conducted to find the root causes of premature pump failure and solution. As the control
parameter, safety aspect shall always be maintained during well service job. Using DMAIC (Define
Measure Analyze Improve Control) framework, the problems are studied with structured thinking
process from the problem definition and measuring current process outcome based on official database
of tear down analysis of electric submersible pump. It is continued with analyzing root causes of
premature failures and alternatives of improvement are proposed. Root causes of majority premature
pump failures are observed, which are solid interference; manufacturing and assembly; power
disruption; improper pump design; installation practice. Best solution for each root cause is chosen by
selecting attributes important for stakeholders and calculating overall weighed score of effectiveness,
applicability, and production constraint.
Business solution is implemented by dividing phase of pre-execution, execution, and post-execution
and assigned responsible party for each phase. Solution is also differentiated between general solution
and oil well specific solution to ensure effectiveness to problem solving. New business process will be
planned before implementation, and continued improvement is to be done after reviewing the outcome
of implementation. |
format |
Theses |
author |
Prasetya Utama, Ramadhan |
author_facet |
Prasetya Utama, Ramadhan |
author_sort |
Prasetya Utama, Ramadhan |
title |
SUSTAINABLE SAFE AND EFFICIENT WELL SERVICE PROGRAM FOR QUALITY EXECUTION |
title_short |
SUSTAINABLE SAFE AND EFFICIENT WELL SERVICE PROGRAM FOR QUALITY EXECUTION |
title_full |
SUSTAINABLE SAFE AND EFFICIENT WELL SERVICE PROGRAM FOR QUALITY EXECUTION |
title_fullStr |
SUSTAINABLE SAFE AND EFFICIENT WELL SERVICE PROGRAM FOR QUALITY EXECUTION |
title_full_unstemmed |
SUSTAINABLE SAFE AND EFFICIENT WELL SERVICE PROGRAM FOR QUALITY EXECUTION |
title_sort |
sustainable safe and efficient well service program for quality execution |
url |
https://digilib.itb.ac.id/gdl/view/51151 |
_version_ |
1822000868261625856 |