DEVELOPMENT OF TPS CIJAMBE BECOMES TPS 3R IN PASIR SUB-DISTRICT, UJUNG BERUNG, BANDUNG CITY
TPS Cijambe currently has an area of ± 682 m2 and receives garbage from 7 RW in Pasir Endah Village. Waste management at TPS Cijambe still has several problems, such as: inadequate TPS management, no organic waste processing, transportation to landfill unschedule, and no waste separation at the sour...
Saved in:
Main Author: | Gandira Waskita Adiya, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51246 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN AND OPTIMIZATION OF 3R TPS SOLID SYSTEM IN MELONG SUB-DISTRICT SOUTH OF CIMAHY CITY
by: Saleh, Arif -
PENGEMBANGAN TPS CIBEUNYING MENJADI TPS TERINTEGRASI DI KOTA BANDUNG
by: Fawwaz Atmaya, Haifa -
REDESIGN OF TPS 3R AND INORGANIC WASTE TREATMENT INSTALLATION AT TPS 3R DESA MERBUNG, SOUTH KLATEN, KLATEN, CENTRAL JAVA
by: Saraswati, Dianisti -
REDESIGNING WASTE TEMPORARY SHELTER (TPS) SUCI BANDUNG INTO A REDUCE, REUSE, AND RECYCLE BASED WASTE MANAGEMENT FACILITY (TPS 3R)
by: Riskita Marina, Trie -
REDESIGN OF TPS 3R KEDURUS, KARANG PILANG, SURABAYA
by: Ulfah Zatadini, Sharfina