PERANCANGAN PONDASI PANGKAL PILAR JEMBATAN BARU BR 355 KM 110 + 532 PADA PARTIAL DOUBLE TRACK CIGANEA - SUKATANI
<b>Abstract :</b><p align="justify">In order to increase the line capacity between Cikampek and Padalarang, the Government of Indonesia is currently constructing the second track besides the existing track. These second tracks are constructing at three different location....
Saved in:
Main Author: | Budi Widodo, P.S. |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/5136 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERANCANGAN PANGKAL DAN PILAR JEMBATAN BARU BH. 372 KM. 114+572 ANTARA CIGANEA - SUKATANI
by: Wahyu Setiawati, Rini -
Perancangan Pondasi dan Perkuatan Pilar Jembatan
Studi Kasus Pilar Jembatan Kereta Api Lintas Babat - Tuban
by: NAJIB TAWANGALUN, AHMAD -
Analisis dan simulasi numeris kelongsoran pada Embankment jalur Kereta Api Ciganea-Sukatani Km 113+300
by: , HANDIMAN, Iman, et al.
Published: (2005) -
Aerosol size distribution derived from 355-nm and 532-nm Mie lidar signals
by: Vallar, Edgar A., et al.
Published: (2006) -
Atmospheric turbidity measurements using a 355NM-532NM lidar and a sunphotometer in Manila, Philippines
by: Vallar, Edgar A., et al.
Published: (2011)