PERANCANGAN PANGKAL DAN PILAR JEMBATAN BARU BH. 372 KM. 114+572 ANTARA CIGANEA - SUKATANI
<b>Abstract:<p align=\"justify\"> <br /> The Railways Company plays an important role to fulfill the demand of transportation of passengers and goods. The developments of double track are needed to raise the capacity of transportation. To enhance the service of train, it...
Saved in:
Main Author: | Wahyu Setiawati, Rini |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/5145 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERANCANGAN PONDASI PANGKAL PILAR JEMBATAN BARU BR 355 KM 110 + 532 PADA PARTIAL DOUBLE TRACK CIGANEA - SUKATANI
by: Budi Widodo, P.S. -
Analisis dan simulasi numeris kelongsoran pada Embankment jalur Kereta Api Ciganea-Sukatani Km 113+300
by: , HANDIMAN, Iman, et al.
Published: (2005) -
Perancangan Pondasi dan Perkuatan Pilar Jembatan
Studi Kasus Pilar Jembatan Kereta Api Lintas Babat - Tuban
by: NAJIB TAWANGALUN, AHMAD -
Gerusan lokal dasar sungai di sekitar pilar jembatan (Penelitian kasus pada jembatan kereta api BH/549 Maos)
by: , PUTRO, Suyitno Hadi, et al.
Published: (1998) -
ANALISIS KELONGSORAN LERENG PADA JALUR KERETA API KM 107 CIGANEA DENGAN MENGGUNAKAN METODE ELEMEN HINGGA
by: Arlini Wijayanti, Maureen