OPTIMIZATION OF THE NUMBER OF DUMP TRUCKS USING QUEUING THEORY TO MINIMIZE THE LOADING AND HAULING COST OF OVERBURDEN AT BATU HIJAU MINE PT AMMAN MINERAL NUSA TENGGARA
The main activity in the mining industry is the hauling of material from one place to another. One part of the operational costs directly related to this activity is the production unit costs of material hauling. By optimizing the amount of dump truck used, the production unit costs of material h...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51484 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:51484 |
---|---|
spelling |
id-itb.:514842020-09-28T21:31:12ZOPTIMIZATION OF THE NUMBER OF DUMP TRUCKS USING QUEUING THEORY TO MINIMIZE THE LOADING AND HAULING COST OF OVERBURDEN AT BATU HIJAU MINE PT AMMAN MINERAL NUSA TENGGARA Widjaja, Michael Pertambangan dan operasi berkaitan Indonesia Final Project dump trucks, cycle queuing system, material removal, production unit costs INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51484 The main activity in the mining industry is the hauling of material from one place to another. One part of the operational costs directly related to this activity is the production unit costs of material hauling. By optimizing the amount of dump truck used, the production unit costs of material hauling can be reduced to a minimum. To be able to carry out material removal activities effectively and efficiently, a method of optimizing the number of dump trucks is needed. The method used in this study is queuing theory because it can simulate waiting times and the number of queues that occur from various variations of the number of dump trucks used in the material removal system. This research was conducted at the Batu Hijau Mine of PT Amman Mineral Nusa Tenggara which uses a conventional truck and shovel mining system to move overburden material from the mining front to waste dump. In this study, it is assumed that there are only four service nodes in the overburden material removal cycle queuing system, namely overburden material loading on the work front, transporting overburden material to the waste dump, overburden material disposal in the waste dump, and returning to the work front. The purpose of this study is to determine the cheapest loading and transportation costs based on the optimal number of dump trucks. By varying the number of dump trucks used in this queuing system, ten dump trucks resulted in the lowest production unit costs. It is $ 0.770/ton of overburden material. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Pertambangan dan operasi berkaitan |
spellingShingle |
Pertambangan dan operasi berkaitan Widjaja, Michael OPTIMIZATION OF THE NUMBER OF DUMP TRUCKS USING QUEUING THEORY TO MINIMIZE THE LOADING AND HAULING COST OF OVERBURDEN AT BATU HIJAU MINE PT AMMAN MINERAL NUSA TENGGARA |
description |
The main activity in the mining industry is the hauling of material from one place to another.
One part of the operational costs directly related to this activity is the production unit costs
of material hauling. By optimizing the amount of dump truck used, the production unit costs
of material hauling can be reduced to a minimum. To be able to carry out material removal
activities effectively and efficiently, a method of optimizing the number of dump trucks is
needed. The method used in this study is queuing theory because it can simulate waiting
times and the number of queues that occur from various variations of the number of dump
trucks used in the material removal system. This research was conducted at the Batu Hijau
Mine of PT Amman Mineral Nusa Tenggara which uses a conventional truck and shovel
mining system to move overburden material from the mining front to waste dump. In this
study, it is assumed that there are only four service nodes in the overburden material removal
cycle queuing system, namely overburden material loading on the work front, transporting
overburden material to the waste dump, overburden material disposal in the waste dump,
and returning to the work front. The purpose of this study is to determine the cheapest
loading and transportation costs based on the optimal number of dump trucks. By varying
the number of dump trucks used in this queuing system, ten dump trucks resulted in the lowest
production unit costs. It is $ 0.770/ton of overburden material. |
format |
Final Project |
author |
Widjaja, Michael |
author_facet |
Widjaja, Michael |
author_sort |
Widjaja, Michael |
title |
OPTIMIZATION OF THE NUMBER OF DUMP TRUCKS USING QUEUING THEORY TO MINIMIZE THE LOADING AND HAULING COST OF OVERBURDEN AT BATU HIJAU MINE PT AMMAN MINERAL NUSA TENGGARA |
title_short |
OPTIMIZATION OF THE NUMBER OF DUMP TRUCKS USING QUEUING THEORY TO MINIMIZE THE LOADING AND HAULING COST OF OVERBURDEN AT BATU HIJAU MINE PT AMMAN MINERAL NUSA TENGGARA |
title_full |
OPTIMIZATION OF THE NUMBER OF DUMP TRUCKS USING QUEUING THEORY TO MINIMIZE THE LOADING AND HAULING COST OF OVERBURDEN AT BATU HIJAU MINE PT AMMAN MINERAL NUSA TENGGARA |
title_fullStr |
OPTIMIZATION OF THE NUMBER OF DUMP TRUCKS USING QUEUING THEORY TO MINIMIZE THE LOADING AND HAULING COST OF OVERBURDEN AT BATU HIJAU MINE PT AMMAN MINERAL NUSA TENGGARA |
title_full_unstemmed |
OPTIMIZATION OF THE NUMBER OF DUMP TRUCKS USING QUEUING THEORY TO MINIMIZE THE LOADING AND HAULING COST OF OVERBURDEN AT BATU HIJAU MINE PT AMMAN MINERAL NUSA TENGGARA |
title_sort |
optimization of the number of dump trucks using queuing theory to minimize the loading and hauling cost of overburden at batu hijau mine pt amman mineral nusa tenggara |
url |
https://digilib.itb.ac.id/gdl/view/51484 |
_version_ |
1822928759359012864 |