OPTIMIZATION OF THE NUMBER OF DUMP TRUCKS USING QUEUING THEORY TO MINIMIZE THE LOADING AND HAULING COST OF OVERBURDEN AT BATU HIJAU MINE PT AMMAN MINERAL NUSA TENGGARA
The main activity in the mining industry is the hauling of material from one place to another. One part of the operational costs directly related to this activity is the production unit costs of material hauling. By optimizing the amount of dump truck used, the production unit costs of material h...
Saved in:
主要作者: | Widjaja, Michael |
---|---|
格式: | Final Project |
語言: | Indonesia |
主題: | |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/51484 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
STUDY ON RAINFALL CHARACTERISTIC IN COPPER MINING AREA BATU HIJAU MINE, WEST NUSA TENGGARA
由: Nur Annisa, Iqlima -
OPTIMATION OF LOADING AND HAULING COSTS WITH LINEAR PROGRAMING METHOD IN QUARRY D PT. ABC
由: Iqbal, Muhamad -
MINE DRAINAGE FACILITIES PLANNING IN QUARRY A AND DUMP 1 PT INDOCEMENT TUNGGAL PRAKARSA PALIMANAN
由: Riga Ambardani, Kharisma -
ANALYSIS OF FLY ASH PERFORMANCE AS A LAYERING MATERIAL POTENTIAL ACID FORMING USING COLUMN TEST AND FIELD DUMPING TEST
由: Harnanda, Suriandi -
GEOLOGI DAN ANALISA KESTABILAN LERENG DINDING BARAT
PIT BATU HIJAU, PT. AMMAN MINERAL NUSA TENGGARA
由: Hafizah A.Abdan, Lua Nafsiah, et al.
出版: (2018)