KOJA CONTAINER TERMINAL OPERATION PATTERN DESIGN, TANJUNG PRIOK PORT, NORTH JAKARTA

Koja Container Terminal is one of the terminals located at Tanjung Priok Port, located in North Jakarta. TPK Koja has been serving since 1997 in anticipation of the demand for packaging services in the early 1990s in line with the increasing increase in export and import activities at Tanjung Priok...

Full description

Saved in:
Bibliographic Details
Main Author: Brian Prasetya, Benediktus
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/51632
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:51632
spelling id-itb.:516322020-09-29T16:44:29ZKOJA CONTAINER TERMINAL OPERATION PATTERN DESIGN, TANJUNG PRIOK PORT, NORTH JAKARTA Brian Prasetya, Benediktus Indonesia Final Project Koja Container Terminal, Terminal Operation, Container, Productivity, Capacity, Cost, Rate INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/51632 Koja Container Terminal is one of the terminals located at Tanjung Priok Port, located in North Jakarta. TPK Koja has been serving since 1997 in anticipation of the demand for packaging services in the early 1990s in line with the increasing increase in export and import activities at Tanjung Priok Port. In order to realize the role of TPK Koja, this final project will discuss the Design of Operation Pattern for Koja Container Terminal in Tanjung Priok Port. The Operation Pattern Design is based on the Port Master Plan that has been established by the government. The design of the operation pattern includes the design of the wharf pattern, the design of the piling field operation pattern and the calculation of capital costs and container handling rates. The design of the wharf operation pattern includes the design of the berth area, the combination of moored vessels, the determination of handling equipment as well as the calculation of the container handling design capacity at the wharf. The design of the piling field operation pattern includes the design of the stacking field area, the determination of the horizontal transportation means, the calculation of the design capacity for the stacking field handling and the horizontal transportation operation pattern. Calculation of container handling fees and rates including calculation of equipment prices, calculation of capital costs, expenses and income per year and determination of container handling rates. The calculation of costs and rates for container handling is carried out under a total procurement scenario, the initial investment costs are loan with a repayment period of 10 years text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Koja Container Terminal is one of the terminals located at Tanjung Priok Port, located in North Jakarta. TPK Koja has been serving since 1997 in anticipation of the demand for packaging services in the early 1990s in line with the increasing increase in export and import activities at Tanjung Priok Port. In order to realize the role of TPK Koja, this final project will discuss the Design of Operation Pattern for Koja Container Terminal in Tanjung Priok Port. The Operation Pattern Design is based on the Port Master Plan that has been established by the government. The design of the operation pattern includes the design of the wharf pattern, the design of the piling field operation pattern and the calculation of capital costs and container handling rates. The design of the wharf operation pattern includes the design of the berth area, the combination of moored vessels, the determination of handling equipment as well as the calculation of the container handling design capacity at the wharf. The design of the piling field operation pattern includes the design of the stacking field area, the determination of the horizontal transportation means, the calculation of the design capacity for the stacking field handling and the horizontal transportation operation pattern. Calculation of container handling fees and rates including calculation of equipment prices, calculation of capital costs, expenses and income per year and determination of container handling rates. The calculation of costs and rates for container handling is carried out under a total procurement scenario, the initial investment costs are loan with a repayment period of 10 years
format Final Project
author Brian Prasetya, Benediktus
spellingShingle Brian Prasetya, Benediktus
KOJA CONTAINER TERMINAL OPERATION PATTERN DESIGN, TANJUNG PRIOK PORT, NORTH JAKARTA
author_facet Brian Prasetya, Benediktus
author_sort Brian Prasetya, Benediktus
title KOJA CONTAINER TERMINAL OPERATION PATTERN DESIGN, TANJUNG PRIOK PORT, NORTH JAKARTA
title_short KOJA CONTAINER TERMINAL OPERATION PATTERN DESIGN, TANJUNG PRIOK PORT, NORTH JAKARTA
title_full KOJA CONTAINER TERMINAL OPERATION PATTERN DESIGN, TANJUNG PRIOK PORT, NORTH JAKARTA
title_fullStr KOJA CONTAINER TERMINAL OPERATION PATTERN DESIGN, TANJUNG PRIOK PORT, NORTH JAKARTA
title_full_unstemmed KOJA CONTAINER TERMINAL OPERATION PATTERN DESIGN, TANJUNG PRIOK PORT, NORTH JAKARTA
title_sort koja container terminal operation pattern design, tanjung priok port, north jakarta
url https://digilib.itb.ac.id/gdl/view/51632
_version_ 1822928799980847104