ANALYSIS OF SLOPE STABILITY DUE TO BLASTING OPERATIONS FROM THE JAKARTA-BANDUNG FAST TRAIN TUNNEL NUMBER 4 WITH THE LIMIT EQUILIBRIUM METHOD

PT. SINOHYDRO and PT. POWERCHINA with PT. DAHANA (Persero) is currently constructing the Jakarta-Bandung Fast Train Tunnel No.4 in Purwakarta Regency. The tunnel construction was carried out by blasting operations, so it was feared that it could affect the stability of the slopes around the tunne...

Full description

Saved in:
Bibliographic Details
Main Author: Jalaludin, Haris
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/51644
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia