ANALYSIS OF SLOPE STABILITY DUE TO BLASTING OPERATIONS FROM THE JAKARTA-BANDUNG FAST TRAIN TUNNEL NUMBER 4 WITH THE LIMIT EQUILIBRIUM METHOD
PT. SINOHYDRO and PT. POWERCHINA with PT. DAHANA (Persero) is currently constructing the Jakarta-Bandung Fast Train Tunnel No.4 in Purwakarta Regency. The tunnel construction was carried out by blasting operations, so it was feared that it could affect the stability of the slopes around the tunne...
Saved in:
Main Author: | Jalaludin, Haris |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51644 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SLOPE STABILITY ANALISYS OF JOINTED ROCK DUE TO BLASTING OF THE 4TH TUNNEL OF JAKARTA-BANDUNG HIGH SPEED RAILWAY PROJECT
by: Aditya, Fariz -
SLOPE STABILITY ANALYSIS OF SOIL AND ROCK AROUND BOHONG MOUNTAIN, PADALARANG DUE TO BLASTING AT TUNNEL #11 HIGH-SPEED RAILWAY JAKARTA - BANDUNG
by: Dwifajar Prabowo, Jerry -
ANALYSIS OF THE IMPACT OF BLASTING TUNNEL # 4 ON THE JAKARTA-BANDUNG FAST TRAIN PROJECT ON RESIDENCE
by: Pratama, Rengga -
ANALYSIS OF VIBRATION EFFECT ON SURFACE BLASTING TOWARDS THE STABILITY OF TUNNEL # 4 THE INDONESIA-CHINA HIGH SPEED RAILWAY PROJECT, PURWAKARTA
by: Maulana, Yuga -
STABILITY ANALYSIS OF UNDERGROUND OPENING DUE TO BLASTING ACTIVITY OF UNDERCUT AT DEEP MILL LEVEL ZONE UNDERGROUND MINE, PT FREEPORT INDONESIA
by: Razak, Supardi