EVALUATION OF THE EFFECT OF EXPLOSION HOLE DRILLING PATTERN ACCURACY USING GPS ON THE EXCAVATION TIME BY EXCAVATION TOOL IN PT THIESS CONTRACTORS INDONESIA SITE SANGATTA, PT KALTIM PRIMA COAL
A good mining process has a crucial role in achieving production targets. One of the ways to support the achievement of production targets is by improving the drilling accuracy of the drilling tool, observed from the blast hole pattern and the digging time of the Excavation tool, the HITACHI Excavat...
Saved in:
Main Author: | Bhagaskara Dipoatmojo, Mohammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51647 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALISIS STABILITAS AZALEA POND PT. KALTIM PRIMA COAL SANGATTA KALIMANTAN TIMUR
by: , EVI DESSYANTI, et al.
Published: (2014) -
ANALISIS PRODUKTIVITAS ALAT GALI-MUAT LIEBHERR R9350 PT THIESS CONTRACTORS INDONESIA JOBSITE WAHANA HANOMAN KALIMANTAN SELATAN
by: Fani, Niko -
ANALYSIS OF EXCAVATOR PRODUCTIVITY SHOVEL LIEBHERR R996 TO THREE DIFFERENT TYPES OF TRUCKS (LIEBHERR T282, EUCLID EH4500 AND CAT 789B) AT PIT BENDILI, PT. KALTIM PRIMA COAL
by: YUDI LESMANA (NIM : 12106047); Pembimbing : Dr. Ir. Budi Sulistianto, -
KAJIAN PROBABILITAS KEMANTAPAN LERENG PADA HIGHWALL, UNTUK
REKOMENDASI OPTIMALISASI PIT PELIKAN PT. KALTIM PRIMA COAL SITE
SANGATTA, KABUPATEN KUTAI TIMUR, PROVINSI KALIMANTAN TIMUR
by: Ariefudin Zuhri, Mochammad, et al.
Published: (2017) -
Divestasi saham PT. Kaltim Prima Coal ditinjau dari kontrak karya antara Pemerintah R.I. dengan PT. Kaltim Prima Coal
by: , ASYARI, Fatimah, et al.
Published: (2002)