BARRAGE DESIGN OF CILIWUNG FLOODWAY ON CILIWUNG RIVERS AS JAKARTA FLOOD CONTROL
Flood is a natural disaster that can be detrimental both financially and in welfare, security, and comfort, especially for DKI Jakarta as the capital of Indonesia. Therefore, a solution is needed in Jakarta flood control efforts. As a flood control effort, JICA in 1997 planned the construction of...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/51948 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Flood is a natural disaster that can be detrimental both financially and in welfare,
security, and comfort, especially for DKI Jakarta as the capital of Indonesia.
Therefore, a solution is needed in Jakarta flood control efforts. As a flood control
effort, JICA in 1997 planned the construction of a floodway from the Ciliwung river
to the Cisadane river in the form of a tunnel with a total floodway length of 1,100
m and the capacity of this floodway has a capacity discharge of 600 m3/s (two
channels).
In the 1997 JICA plan to diverted the flow into the tunnel using a fixed weir that
could not regulate the height of the water level upstream or output downstream. So,
it is designed Barrage to replace the fix weir as an divertion building so that the
output discharge to the downstream can be controlled and it is less than Siaga I
Katulampa (< Siaga I= 441 m3/s) of Katulampa so that the risk of flooding in DKI
Jakarta can be reduced. The planned flood discharge is 790 m3/s and will be
diverted into a tunnel of 300 m3/s (1 tunnel closed) so that the discharge of 490
m3/s will be withheld by Bendung Gerak.
Bendung planning this motion is in the upstream of the Ciliwung watershed, Ciawi
District, Sukasari Village, Bogor City with the budget for the construction of
Bendung Gerak Sukasari amounting to Rp. 32,607,246,613.55 and for the total
budget of the Ciliwung Floodway work project to Rp. 1,741,300,440,000. |
---|