UNCERTAINTY ANALYSIS OF ECONOMIC EVALUATION FOR CO2 INJECTION USING DETERMINISITC-STOCHASTIC PARTICLE SWARM OPTIMIZATION (PSO) COMBINATION
The utilization of CO2 gas from the oil and gas fields or industry for the purposes of EOR has a dual purpose which to increase reserves and also to help deal with the greenhouse effect. The source of CO2 supply in Field X are from Merbau Gas Gathering Station and Bukit Asam Power Plant with rate 15...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/52078 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |