UNCERTAINTY ANALYSIS OF ECONOMIC EVALUATION FOR CO2 INJECTION USING DETERMINISITC-STOCHASTIC PARTICLE SWARM OPTIMIZATION (PSO) COMBINATION

The utilization of CO2 gas from the oil and gas fields or industry for the purposes of EOR has a dual purpose which to increase reserves and also to help deal with the greenhouse effect. The source of CO2 supply in Field X are from Merbau Gas Gathering Station and Bukit Asam Power Plant with rate 15...

Full description

Saved in:
Bibliographic Details
Main Author: Rahajeng Suryo Rahmadhini, RR
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/52078
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia