RANCANGAN AWAL ALAT UKUR CHANGE READINESS INDIVIDU PT X
PT X is a state-owned company (BUMN) engaged in the metal manufacturing industry, especially military products. PT X was established to provide the needs of the main armament system to support the implementation of the defense and security of the Republic of Indonesia. In 2019-2020 there was a chang...
Saved in:
Main Author: | Hana Benitaputri, Shavira |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/52157 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
URBAN WATERFRONT DESIGN IN KALIMAS RIVER AREA PETEKAN BRIDGE TANJUNG PERAK PORT SURABAYA
by: Gilang Permana, Redisya -
TRANSIT ORIENTED DEVELOPMENT BASED DESIGN IN OLD CITY CENTER CASE STUDY: THE PAKUAN BUILDING AND BANDUNG CITY STATION AREA
by: Maya Wibowo, Indira -
DESIGNING CIKAPUNDUNGâS RIVERSIDE AREA WITH SUSTAINABLE WATERFRONT DEVELOPMENT PRINCIPLES (Study Case: Kampung Braga Area on the Cikapundung Riverside)
by: Quando Armas, Dicko -
WALKABILITY DESIGN STUDY USING URBAN NETWORK ANALYSIS IN TANAH ABANG STATION AREA JAKARTA
by: Nourma Iksanti, Aline -
THE ROLE OF ALUN-ALUN CICENDO AS THIRD PLACE
by: Ulvianti, Fitri