DEVELOPING DISASTER RECOVERY PLAN FOR CONSTRUCTION COMPANY (CASE STUDY OF PT. IMPCC)

As the construction industry strives through years of countless competitions, developments, innovations, and improvements. It came to this age where most construction companies use Information and Technology (IT) systems to support their business, including their business processes. Indonesian Mu...

Full description

Saved in:
Bibliographic Details
Main Author: Azizi Nun, Muhammad
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/53060
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:53060
spelling id-itb.:530602021-02-27T09:14:26ZDEVELOPING DISASTER RECOVERY PLAN FOR CONSTRUCTION COMPANY (CASE STUDY OF PT. IMPCC) Azizi Nun, Muhammad Manajemen umum Indonesia Theses Disaster Recovery Plan, Business Impact Analysis, Risk Assessment, Construction Industry. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/53060 As the construction industry strives through years of countless competitions, developments, innovations, and improvements. It came to this age where most construction companies use Information and Technology (IT) systems to support their business, including their business processes. Indonesian Multinational Private Construction Company (IMPCC, not the real name), as a major player in the Indonesian construction industry, also uses IT systems to underline IMPCC’s business processes, centralized in 2 Data Centers (DCs). The DCs went into a disastrous event, which cost them a lot in the third quarter of 2019. The event urged them to study the Disaster Recovery Plan (DRP) to avoid the same disaster or similar risks from hitting IMPCC’s IT systems. Disaster Recovery Plan (DRP) is planning, developing, implementing, and improving the availability of a company’s IT systems for an organization to ensure its continuity by planning, developing, and implementing processes and procedures to survive through uncertainties. The DRP processes are Business Impact Analysis (BIA) for identifying divisions, business processes, IT systems used by them, priorities, and tolerance of IT Systems’ data loss and time of disruption. Then Risk Analysis (RA), developing the DRP strategies, strategies for testing and training, and the implementation plan. From the analysis process done in this study, from 36 threats identified, three threats address the significant risk of DC A and DC B being in one area of locations, which lead to a conclusion of moving either one or both of the DCs to a different area of locations. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Azizi Nun, Muhammad
DEVELOPING DISASTER RECOVERY PLAN FOR CONSTRUCTION COMPANY (CASE STUDY OF PT. IMPCC)
description As the construction industry strives through years of countless competitions, developments, innovations, and improvements. It came to this age where most construction companies use Information and Technology (IT) systems to support their business, including their business processes. Indonesian Multinational Private Construction Company (IMPCC, not the real name), as a major player in the Indonesian construction industry, also uses IT systems to underline IMPCC’s business processes, centralized in 2 Data Centers (DCs). The DCs went into a disastrous event, which cost them a lot in the third quarter of 2019. The event urged them to study the Disaster Recovery Plan (DRP) to avoid the same disaster or similar risks from hitting IMPCC’s IT systems. Disaster Recovery Plan (DRP) is planning, developing, implementing, and improving the availability of a company’s IT systems for an organization to ensure its continuity by planning, developing, and implementing processes and procedures to survive through uncertainties. The DRP processes are Business Impact Analysis (BIA) for identifying divisions, business processes, IT systems used by them, priorities, and tolerance of IT Systems’ data loss and time of disruption. Then Risk Analysis (RA), developing the DRP strategies, strategies for testing and training, and the implementation plan. From the analysis process done in this study, from 36 threats identified, three threats address the significant risk of DC A and DC B being in one area of locations, which lead to a conclusion of moving either one or both of the DCs to a different area of locations.
format Theses
author Azizi Nun, Muhammad
author_facet Azizi Nun, Muhammad
author_sort Azizi Nun, Muhammad
title DEVELOPING DISASTER RECOVERY PLAN FOR CONSTRUCTION COMPANY (CASE STUDY OF PT. IMPCC)
title_short DEVELOPING DISASTER RECOVERY PLAN FOR CONSTRUCTION COMPANY (CASE STUDY OF PT. IMPCC)
title_full DEVELOPING DISASTER RECOVERY PLAN FOR CONSTRUCTION COMPANY (CASE STUDY OF PT. IMPCC)
title_fullStr DEVELOPING DISASTER RECOVERY PLAN FOR CONSTRUCTION COMPANY (CASE STUDY OF PT. IMPCC)
title_full_unstemmed DEVELOPING DISASTER RECOVERY PLAN FOR CONSTRUCTION COMPANY (CASE STUDY OF PT. IMPCC)
title_sort developing disaster recovery plan for construction company (case study of pt. impcc)
url https://digilib.itb.ac.id/gdl/view/53060
_version_ 1822001411423993856