EVALUASI ASPEK FINANSIAL UNTUK KELANJUTAN PROSES PEMBANGUNAN PABRIK FERONIKEL UNIT III DI POMALAA SULAWESI TENGGARA TAHUN 2002 DENGAN METODE PERCENT OF SALES
<b></i>Abstract : </b><i><p align=\"justify\"> <br /> In effort of keeping on continuity and business development of PT. Aneka Tambang Tbk to develop \'tickle commodity by planning to build factory for feronickel III in Pomalaa, South Fast Sulawesi...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/5316 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | <b></i>Abstract : </b><i><p align=\"justify\"> <br />
In effort of keeping on continuity and business development of PT. Aneka Tambang Tbk to develop \'tickle commodity by planning to build factory for feronickel III in Pomalaa, South Fast Sulawesi. <br />
<p align=\"justify\"> <br />
The company planning investment in building factory FeNi III needs fund around 949.8 billion rupiahs, since this building is excuted the fund has been being invented is 400 million, so that the fund has still needed to build factory is 949.4 billion. <br />
<p align=\"justify\"> <br />
This research is to aim getting elaboration of financial ability of PT. Aneka Tambang Tbk concerning with the continuity of building factory of FeNi III in Pomalaa, South East Sulawesi and also to know the financial ability of company from 1998 up to 2001, beside knowing the ability of company in gaining expected selling grade, and also to know the ability of PT. Aneka Tambang Tbk in 2002 based on prediction to identify the ability of company to build factory of FeNi III in Pomalaa. <br />
<p align=\"justify\"> <br />
For that reason, the solution of the main object by collecting data about aspiration of PT. Aneka Tambang Tbk and then collecting data the scope of business and the investment necessity of FeNi III factory and also collecting financial data of PT. Aneka Tambang Tbk and branch company. <br />
<p align=\"justify\"> <br />
Then after collecting, being excuted analyziz the financial company ability and then being excuted simulation of financial circumstance to predict PT. Aneka Tambang Tbk\'s financial and the branch company. <br />
<p align=\"justify\"> <br />
By seeing cash flow in 2002. It does not matter if the fund as much as 949.9 billion is used to cost investment beside that by selling the stock which is excuted by the company, therefore. The fund will be available for the investment as much as 949.4 billion will be more or available. <br />
<p align=\"justify\"> <br />
Whenever the company will expend for building factory beside intern expense, it could also use alternative resource of extern expense base on report of balance of PT. Aneka Tambang Tbk for December 31. 2002 that is having long range loan as much as 517 billion. <br />
<p align=\"justify\"> <br />
The company is optimistic with the main key ucces that belong to PT. Aneka Tambang Tbk as mine company, therefore the business prospective keep on stable such as previous years, because has ability to compete through the excellent product quality and expense. <br />
<p align=\"justify\"> <br />
PT. Aneka Tambang has had firmly customers in long range agreement for feronickle which has been followed up with confirmation letter by Krupp Thyssen Nirosta, Newco and Mitsui. <br />
<p align=\"justify\"> <br />
The planning of building factory FeNi III in Pomalaa will keep on excuting eventhough it has ever been delayed because of espenses problem. Endeavor keeps on going in order to continue to build FeNi III. <br />
|
---|