EVALUASI ASPEK FINANSIAL UNTUK KELANJUTAN PROSES PEMBANGUNAN PABRIK FERONIKEL UNIT III DI POMALAA SULAWESI TENGGARA TAHUN 2002 DENGAN METODE PERCENT OF SALES
<b></i>Abstract : </b><i><p align=\"justify\"> <br /> In effort of keeping on continuity and business development of PT. Aneka Tambang Tbk to develop \'tickle commodity by planning to build factory for feronickel III in Pomalaa, South Fast Sulawesi...
Saved in:
Main Author: | Tua Siregar (NIM 28199117), Purba |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/5316 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Evaluasi dampak lingkungan akibat pemanfaatan Tailing Pabrik ikel di Kecamatan Pomalaa Kabupaten Kolaka Propinsi Sulawesi Tenggara
by: , ANHAR, et al.
Published: (2006) -
ANALISIS FAKTOR PENYEBAB GANGGUAN MUSKULOSKELETAL PADA PEKERJA DI PABRIK FERONIKEL BAGIAN SMELTING PT. ANEKA TAMBANG (PERSERO) TBK UNIT BISNIS PERTAMBANGAN NIKEL SULAWESI TENGGARA
by: , Syawal K. Saptaputra, et al.
Published: (2014) -
Mineralogi dan karakteristik geokimia endapan nikel laterit di daerah tambang tengah PT. Antam Tbk. UBPN. Pomalaa-Sulawesi Tenggara
by: , MUSNAJAM, et al.
Published: (2008) -
EVALUASI KELAYAKAN KELANJUTAN PEMBANGUNAN KOMPLEKS PETROKIMIA TUBAN
by: Made Samudra, I -
STUDY ON THE BENEFIT AT PT ANEKA TAMBANG POMALAA TOWARD REGIONAL KOLAKA REGENCY SOUTHEAST SULAWESI PROVINCE
by: Dean Ridwan , Faizal