PROPOSE THE BEST SMART DEVICE FOR PT.PLN (PERSERO) UP2D WEST JAVA USING ANAYLITICAL HIERARCHY PROCESS DUE TO SUPPORTING PREVENTIVE OF MASSIVE OUTAGE AT 20 KV SUBSTATION IN WEST JAVA REGION
West Java region is the region with the largest number of revenue suppliers for PLN because many customers in the region are from the industrial sector. Based on existing data from 2017 to 2020, the massive outage that occurred in the West Java region was still relatively high. According to its cond...
Saved in:
Main Author: | Haryadinata, Yusvian |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/53179 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
Studies of lightning overvoltages of 115 kV CMU GIS substation
by: Thanasaksiri T.
Published: (2017)
by: Thanasaksiri T.
Published: (2017)
Similar Items
-
STRUCTURAL DESIGN OF DOLPHIN FOR COAL IN PELABUHAN INDONESIA II SUBSTATION CIREBON, WEST JAVA
by: Prajaya - nIM: 15514030 , Geraldy -
BIODIVERSITY CENTER OF WEST JAVA
by: Ramadhita, Nadilla -
WEST JAVA BUILDING of ARTS
by: AULIA RIDHA KANIA (NIM : 15209065), ASRI -
ANALYSIS ON EFFECTIVENESS OF KEY ACCOUNT MANAGEMENT PRACTICES IN PT PLN (PERSERO) WEST JAVA DISTRIBUTION UNIT
by: Agung Nugraha, Ridho -
MAIN TEMPLE IN LEMBANG, WEST JAVA
by: Veronica Wirjono, Lia