VALUATION FOR HIGH-RISK COAL MINING PROJECT CASE STUDY: PT. BERAU COAL BLOCK PARAPATAN
As a high-cost and high-risk business, the coal mining industry faces a significant exposure to high turbulence of uncertainties. Thus, the valuation and assessment of the business project require a comprehensive analysis. The Parapatan Block of Binungan Site, part of CCoW of PT. Berau Coal is an...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/53437 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |