VALUATION FOR HIGH-RISK COAL MINING PROJECT CASE STUDY: PT. BERAU COAL BLOCK PARAPATAN
As a high-cost and high-risk business, the coal mining industry faces a significant exposure to high turbulence of uncertainties. Thus, the valuation and assessment of the business project require a comprehensive analysis. The Parapatan Block of Binungan Site, part of CCoW of PT. Berau Coal is an...
Saved in:
Main Author: | Indrayana, Feri |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/53437 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT PROJECT ANALYSIS OF SURFACE MINERS METHOD BLOCK PARAPATAN SITE BINUNGAN (CASE STUDY : PT BERAU COAL)
by: Hudiantoro, Arief -
INVESTMENT PROJECT ANALYSIS OF PT BERAU COAL BLOCK A, BLOCK B AND BLOCK C COAL MINING PROJECT USING DISCOUNTED CASH FLOW METHOD
by: Wayan Supriharta, Ida -
INDUSTRIAL INTERNET OF THINGS IN INDONESIAN COAL MINING INDUSTRY CASE STUDY PT BERAU COAL
by: Andreas, Reo -
INVESTMENT PROJECT ANALYSIS OF SUSPENSION RIVER CROSSING COAL CONVEYOR PROJECT (CASE STUDY: PRAPATAN MINE OPERATION PT BERAU COAL)
by: Asido Mauliate, Ruben -
PROPOSED COST OPTIMIZATION USING OPERATIONAL EXCELLENCE IN COAL MINE PARAPATAN SITE, EAST KALIMANTAN
by: Anwar Sanusi, Dudu