SERVER PURCHASE PROJECT EXECUTION DELAY AT PT. RAHMAH INFORMASI TEKNOLOGI: CAUSE, IMPACT AND RECOMMENDATION
As the usage of information technology dramatically increases in business, the need to store all of the necessary data becomes important, and several methods of data storage has been developed up until now. One of the most commonly used is on-premise storage, where data is stored in a device called...
Saved in:
Main Author: | Rizkyutami Witjaksono, Atika |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/53481 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Kumpulan Surat Keputusan Dekan An. Mas Rahmah sebagai Kopromotor
Published: (2018) -
PERENCANAAN STRATEGIS PENGEMBANGAN STIDKI AR RAHMAH SURABAYA
TAHUN 2019-2023
by: A. FAIZ KHUDLARI THOHA, 041524353012
Published: (2019) -
MAJOR DELAY CAUSES OF RESIDENTIAL PROJECTS IN THE YANGTZE DELTA OF CHINA
by: CHEN YUAN
Published: (2010) -
Buyers' concerns in purchasing executive condominiums
by: Chua Tse Pin, Kwek Peck Lin
Published: (2014) -
Assessment of Risk Factors Causing Delays in Building Construction Project in Cambodia
by: Wasaporn Techapeeraparnich, et al.
Published: (2022)