OPTIMASI PENGAMBILAN PESANAN MENGGUNAKAN MODEL REGRESI MULTILEVEL DAN ALGORITMA METAHEURISTIK PADA CENTRAL PARTS DEPO PT TOYOTA-ASTRA MOTOR
The SPLD Division of PT Toyota-Astra Motor is responsible for distributing Toyota service parts throughout Indonesia by managing a distribution network originating from the Central Parts Depo (CPD). In December 2019-February 2020, the percentage of on-time delivery truck departures from CPD was stil...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/53635 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |