CONSTRUCTION METHOD AND COST ESTIMATION OF PASSENGER TERMINAL AND AIR SIDE INFRASTRUCTURE OF HANANDJOEDDIN AIRPORT TANJUNG PANDAN

Belitung is one of the cities with quite large tourist attraction in Indonesia. To accommodate the increasing movement of tourists every year, H.A.S. Airport will be built. H.A.S. Hanandjoeddin Airport is an airport located in Tanjung Pandan, Kabupaten Belitung, Kepulauan Bangka Belitung. This ai...

Full description

Saved in:
Bibliographic Details
Main Author: Nabilla Maharani, Ainundhiya
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/54118
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:54118
spelling id-itb.:541182021-03-15T11:55:23ZCONSTRUCTION METHOD AND COST ESTIMATION OF PASSENGER TERMINAL AND AIR SIDE INFRASTRUCTURE OF HANANDJOEDDIN AIRPORT TANJUNG PANDAN Nabilla Maharani, Ainundhiya Indonesia Final Project H.A.S. Hanandjoeddin Airport, Construction Method, Work Volume, Duration of Work, Construction Cost Estimation. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54118 Belitung is one of the cities with quite large tourist attraction in Indonesia. To accommodate the increasing movement of tourists every year, H.A.S. Airport will be built. H.A.S. Hanandjoeddin Airport is an airport located in Tanjung Pandan, Kabupaten Belitung, Kepulauan Bangka Belitung. This airport is planned to have an aircraft take-off and land facility and a passenger terminal covering an area of 12,000 m2. The scope of this final project includes the making of Work Breakdown Structure (WBS), planning construction methods, calculation of the volume of material requirements, construction scheduling calculations, and estimated project costs. The construction method to be planned for the construction of H.A.S. Airport Hanandjoeddin includes preparatory work, passenger terminal structure work, pavement work, and drainage work. The work volume calculation is done manually based on the design results of each aspect. In order to estimate the construction cost, two methods are used, the unit price using the SNI and Permen PUPR No. 28 2016 and resource enumeration. The duration of work is determined based on the heavy equipment leads and the labor resources leads. H.A.S. Hanandjoeddin Airport project is scheduled to be constructed from April 1st, 2021 to December 30, 2024 for a total duration of 978 days. The project direct costs are Rp1,177,595,628,916.99. With additional indirect costs, profit, and taxes, the cost budget plan obtained for the project are Rp1,516,243,502,955.15. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Belitung is one of the cities with quite large tourist attraction in Indonesia. To accommodate the increasing movement of tourists every year, H.A.S. Airport will be built. H.A.S. Hanandjoeddin Airport is an airport located in Tanjung Pandan, Kabupaten Belitung, Kepulauan Bangka Belitung. This airport is planned to have an aircraft take-off and land facility and a passenger terminal covering an area of 12,000 m2. The scope of this final project includes the making of Work Breakdown Structure (WBS), planning construction methods, calculation of the volume of material requirements, construction scheduling calculations, and estimated project costs. The construction method to be planned for the construction of H.A.S. Airport Hanandjoeddin includes preparatory work, passenger terminal structure work, pavement work, and drainage work. The work volume calculation is done manually based on the design results of each aspect. In order to estimate the construction cost, two methods are used, the unit price using the SNI and Permen PUPR No. 28 2016 and resource enumeration. The duration of work is determined based on the heavy equipment leads and the labor resources leads. H.A.S. Hanandjoeddin Airport project is scheduled to be constructed from April 1st, 2021 to December 30, 2024 for a total duration of 978 days. The project direct costs are Rp1,177,595,628,916.99. With additional indirect costs, profit, and taxes, the cost budget plan obtained for the project are Rp1,516,243,502,955.15.
format Final Project
author Nabilla Maharani, Ainundhiya
spellingShingle Nabilla Maharani, Ainundhiya
CONSTRUCTION METHOD AND COST ESTIMATION OF PASSENGER TERMINAL AND AIR SIDE INFRASTRUCTURE OF HANANDJOEDDIN AIRPORT TANJUNG PANDAN
author_facet Nabilla Maharani, Ainundhiya
author_sort Nabilla Maharani, Ainundhiya
title CONSTRUCTION METHOD AND COST ESTIMATION OF PASSENGER TERMINAL AND AIR SIDE INFRASTRUCTURE OF HANANDJOEDDIN AIRPORT TANJUNG PANDAN
title_short CONSTRUCTION METHOD AND COST ESTIMATION OF PASSENGER TERMINAL AND AIR SIDE INFRASTRUCTURE OF HANANDJOEDDIN AIRPORT TANJUNG PANDAN
title_full CONSTRUCTION METHOD AND COST ESTIMATION OF PASSENGER TERMINAL AND AIR SIDE INFRASTRUCTURE OF HANANDJOEDDIN AIRPORT TANJUNG PANDAN
title_fullStr CONSTRUCTION METHOD AND COST ESTIMATION OF PASSENGER TERMINAL AND AIR SIDE INFRASTRUCTURE OF HANANDJOEDDIN AIRPORT TANJUNG PANDAN
title_full_unstemmed CONSTRUCTION METHOD AND COST ESTIMATION OF PASSENGER TERMINAL AND AIR SIDE INFRASTRUCTURE OF HANANDJOEDDIN AIRPORT TANJUNG PANDAN
title_sort construction method and cost estimation of passenger terminal and air side infrastructure of hanandjoeddin airport tanjung pandan
url https://digilib.itb.ac.id/gdl/view/54118
_version_ 1822001697375911936