TECHNICAL PLANNING OF WATER TRANSMISSION NETWORK FOR TOMADO VILLAGE, CENTRAL SULAWESI

In dry seasons, Tomado Village still struggles with the lack of clean water. This is mostly due to bad water transmission network, no water storage, and confusing water management system. As the population grows, so does the water needs, yet the availability doesn’t. With that condition in mind the...

Full description

Saved in:
Bibliographic Details
Main Author: Adi Satya, Galih
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/54128
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:54128
spelling id-itb.:541282021-03-15T12:13:54ZTECHNICAL PLANNING OF WATER TRANSMISSION NETWORK FOR TOMADO VILLAGE, CENTRAL SULAWESI Adi Satya, Galih Indonesia Final Project Weir, Transmission network, Tomado Village, EPANET INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54128 In dry seasons, Tomado Village still struggles with the lack of clean water. This is mostly due to bad water transmission network, no water storage, and confusing water management system. As the population grows, so does the water needs, yet the availability doesn’t. With that condition in mind the solution would be to build a weir and to integrate the existing water transmission network. This report will result in dimensions for designing necessary infrasturctures to fulfill the water needs of Tomado Village for 20 years. Tomado Village. The water network and piping systems will be designed and modeled using EPANET 2.0. Tomado Village has a watershed area of 1,73 km2. Water demand is projected to be at 2.6 l/s in 2040 with the dependable discharge of 0.36 m3/s. The results of this report are designs including, weir, transmission pipes, and reservoir. The cost of realizing these designs came out to Rp. 1,425,000,000.- consisting of construction as well as its operation and maintenance. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In dry seasons, Tomado Village still struggles with the lack of clean water. This is mostly due to bad water transmission network, no water storage, and confusing water management system. As the population grows, so does the water needs, yet the availability doesn’t. With that condition in mind the solution would be to build a weir and to integrate the existing water transmission network. This report will result in dimensions for designing necessary infrasturctures to fulfill the water needs of Tomado Village for 20 years. Tomado Village. The water network and piping systems will be designed and modeled using EPANET 2.0. Tomado Village has a watershed area of 1,73 km2. Water demand is projected to be at 2.6 l/s in 2040 with the dependable discharge of 0.36 m3/s. The results of this report are designs including, weir, transmission pipes, and reservoir. The cost of realizing these designs came out to Rp. 1,425,000,000.- consisting of construction as well as its operation and maintenance.
format Final Project
author Adi Satya, Galih
spellingShingle Adi Satya, Galih
TECHNICAL PLANNING OF WATER TRANSMISSION NETWORK FOR TOMADO VILLAGE, CENTRAL SULAWESI
author_facet Adi Satya, Galih
author_sort Adi Satya, Galih
title TECHNICAL PLANNING OF WATER TRANSMISSION NETWORK FOR TOMADO VILLAGE, CENTRAL SULAWESI
title_short TECHNICAL PLANNING OF WATER TRANSMISSION NETWORK FOR TOMADO VILLAGE, CENTRAL SULAWESI
title_full TECHNICAL PLANNING OF WATER TRANSMISSION NETWORK FOR TOMADO VILLAGE, CENTRAL SULAWESI
title_fullStr TECHNICAL PLANNING OF WATER TRANSMISSION NETWORK FOR TOMADO VILLAGE, CENTRAL SULAWESI
title_full_unstemmed TECHNICAL PLANNING OF WATER TRANSMISSION NETWORK FOR TOMADO VILLAGE, CENTRAL SULAWESI
title_sort technical planning of water transmission network for tomado village, central sulawesi
url https://digilib.itb.ac.id/gdl/view/54128
_version_ 1822001699923951616