BATCH SCHEDULING MODEL FOR HYBRID FLOWSHOP WITH ASSEMBLY AND DEDICATED MACHINES TO MINIMIZE TOTAL ACTUAL FLOW TIME
This research concerns a batch scheduling problem for hybrid flowshop with assembly and dedicated machines which consists of five stage. The first stage is fabrication, this stage consists of several groups of parallel machines where each group of machines produces different component. The second st...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/54143 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!