BATCH SCHEDULING MODEL FOR HYBRID FLOWSHOP WITH ASSEMBLY AND DEDICATED MACHINES TO MINIMIZE TOTAL ACTUAL FLOW TIME
This research concerns a batch scheduling problem for hybrid flowshop with assembly and dedicated machines which consists of five stage. The first stage is fabrication, this stage consists of several groups of parallel machines where each group of machines produces different component. The second st...
Saved in:
Main Author: | Sholikha, Nikmatus |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/54143 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BATCH SCHEDULING MODEL FOR HYBRID FLOWSHOP WITH ASSEMBLY AND DEDICATED MACHINES TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: SHOLIKHA, NIKMATUS -
BATCH SCHEDULING MODEL ON A THREE-STAGE FLOWSHOP WITH THE SEQUENCE OF JOB PROCESSOR BATCH PROCESSOR JOB PROCESSOR TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: Az Zahro, Shafira -
BATCH SCHEDULING FOR A THREE-STAGE HYBRID FLOW SHOP TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: Maulidya, Rahmi -
BATCH SCHEDULING MODEL ON THREE-STAGE FLOWSHOP WITH TWO-STAGE JOB PROCESSOR AND ONE STAGE BATCH PROCESSOR TO MINIMIZE TOTAL ACTUAL FLOWTIME
by: Poeri Suryadhini, Pratya -
SCHEDULING THREE-STAGE HYBRID FLOWSHOP BY CONSIDERING LEAD TIME OF SPARE PARTS ORDERING, FIXED TECHNICIAN AND DEDICATED MACHINE TO MINIMIZE MAKESPAN
by: Windhi P, Oktifian