PAINTSHOP SCHEDULING, TOTAL ACTUAL FLOWTIME, MINIMASI SETUP
The scheduling problem faced by the paintshop at motorcycle manufacturing industry, begins with how to complete the scheduling by minimizing setup time. Setup time is caused by the change of color in the production process paintshop. When a color change occurs in the paintshop production process, eq...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29797 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |