PAINTSHOP SCHEDULING, TOTAL ACTUAL FLOWTIME, MINIMASI SETUP

The scheduling problem faced by the paintshop at motorcycle manufacturing industry, begins with how to complete the scheduling by minimizing setup time. Setup time is caused by the change of color in the production process paintshop. When a color change occurs in the paintshop production process, eq...

Full description

Saved in:
Bibliographic Details
Main Author: ISLAHUDIN NIM: 23415014, NUR
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/29797
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first