PAINTSHOP SCHEDULING, TOTAL ACTUAL FLOWTIME, MINIMASI SETUP
The scheduling problem faced by the paintshop at motorcycle manufacturing industry, begins with how to complete the scheduling by minimizing setup time. Setup time is caused by the change of color in the production process paintshop. When a color change occurs in the paintshop production process, eq...
Saved in:
Main Author: | ISLAHUDIN NIM: 23415014, NUR |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29797 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BATCH SCHEDULING MODEL ON THREE-STAGE FLOWSHOP WITH TWO-STAGE JOB PROCESSOR AND ONE STAGE BATCH PROCESSOR TO MINIMIZE TOTAL ACTUAL FLOWTIME
by: Poeri Suryadhini, Pratya -
A Variable Block Insertion Heuristic for the Blocking Flowshop Scheduling Problem with Total Flowtime Criterion
by: Pan, Quan-Ke, et al.
Published: (2016) -
REFUELLING FLOWTIME IMPROVEMENT AT FUEL TERMINAL X PT EPN
by: Isroq, Syaderli -
A scheduling heuristic for simultaneous minimization of makespan and total weighted tardiness in the open shop setup
by: Siy, Eric A.
Published: (1999) -
BATCH SCHEDULING FOR A THREE-STAGE HYBRID FLOW SHOP TO MINIMIZE TOTAL ACTUAL FLOW TIME
by: Maulidya, Rahmi