Integrating scheduling with optimal sublot for parallel machine with job splitting and dependent setup times

© 2019 This paper addresses a novel problem of the parallel capacitated machines with job splitting and dependent setup times (PCMS), Pmc|split, pj, sjp|Cmax. A mixed integer programming (MIP) model is developed to find an optimal schedule with minimum makespan. Since the problem is NP-hard, metaheu...

Full description

Saved in:
Bibliographic Details
Main Authors: Kanchana Sethanan, Warisa Wisittipanich, Nuttachat Wisittipanit, Krisanarach Nitisiri, Karn Moonsri
Format: Journal
Published: 2020
Subjects:
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85072770875&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/67692
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University