Integrating scheduling with optimal sublot for parallel machine with job splitting and dependent setup times
© 2019 This paper addresses a novel problem of the parallel capacitated machines with job splitting and dependent setup times (PCMS), Pmc|split, pj, sjp|Cmax. A mixed integer programming (MIP) model is developed to find an optimal schedule with minimum makespan. Since the problem is NP-hard, metaheu...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Journal |
Published: |
2020
|
Subjects: | |
Online Access: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85072770875&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/67692 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
Be the first to leave a comment!