METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION

Fulfillment and quality improvement of inter-location connectivity in Indonesia, especially for passengers, can be realized through trip by high speed railway as the mode of transportation and station as the required transportation infrastructure. This final assignment will provide discussion reg...

Full description

Saved in:
Bibliographic Details
Main Author: Hafidh, Muhammad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/54154
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:54154
spelling id-itb.:541542021-03-15T13:04:02ZMETHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION Hafidh, Muhammad Indonesia Final Project High speed railways station, soil improvement, construction method, construction cost estimation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54154 Fulfillment and quality improvement of inter-location connectivity in Indonesia, especially for passengers, can be realized through trip by high speed railway as the mode of transportation and station as the required transportation infrastructure. This final assignment will provide discussion regarding the planning and implementation of Tegalluar High Speed Railways Station. This planning and implementation includes construction method, construction cost estimation, quantity take-off, and project construction schedule. Construction object scope include station building structure, foundation, retaining wall (tunnel), parking pavement, drainage, and station architectural. The construction stages begin from soil improvement, then foundation and retaining wall construction, upper structure, and then the station landscape construction. Construction cost estimation made base on quantity take-off referring to unit cost analysis standard in detail and conceptual. The construction phase start on January 4th 2021 until March 29th2023 or estimated to be completed by 575 workdays and total cost requires is Rp418.827.031.526,00. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Fulfillment and quality improvement of inter-location connectivity in Indonesia, especially for passengers, can be realized through trip by high speed railway as the mode of transportation and station as the required transportation infrastructure. This final assignment will provide discussion regarding the planning and implementation of Tegalluar High Speed Railways Station. This planning and implementation includes construction method, construction cost estimation, quantity take-off, and project construction schedule. Construction object scope include station building structure, foundation, retaining wall (tunnel), parking pavement, drainage, and station architectural. The construction stages begin from soil improvement, then foundation and retaining wall construction, upper structure, and then the station landscape construction. Construction cost estimation made base on quantity take-off referring to unit cost analysis standard in detail and conceptual. The construction phase start on January 4th 2021 until March 29th2023 or estimated to be completed by 575 workdays and total cost requires is Rp418.827.031.526,00.
format Final Project
author Hafidh, Muhammad
spellingShingle Hafidh, Muhammad
METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION
author_facet Hafidh, Muhammad
author_sort Hafidh, Muhammad
title METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION
title_short METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION
title_full METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION
title_fullStr METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION
title_full_unstemmed METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION
title_sort method and cost estimation design of tegalluar high speed railways station
url https://digilib.itb.ac.id/gdl/view/54154
_version_ 1822929524476608512