METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION
Fulfillment and quality improvement of inter-location connectivity in Indonesia, especially for passengers, can be realized through trip by high speed railway as the mode of transportation and station as the required transportation infrastructure. This final assignment will provide discussion reg...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/54154 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:54154 |
---|---|
spelling |
id-itb.:541542021-03-15T13:04:02ZMETHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION Hafidh, Muhammad Indonesia Final Project High speed railways station, soil improvement, construction method, construction cost estimation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54154 Fulfillment and quality improvement of inter-location connectivity in Indonesia, especially for passengers, can be realized through trip by high speed railway as the mode of transportation and station as the required transportation infrastructure. This final assignment will provide discussion regarding the planning and implementation of Tegalluar High Speed Railways Station. This planning and implementation includes construction method, construction cost estimation, quantity take-off, and project construction schedule. Construction object scope include station building structure, foundation, retaining wall (tunnel), parking pavement, drainage, and station architectural. The construction stages begin from soil improvement, then foundation and retaining wall construction, upper structure, and then the station landscape construction. Construction cost estimation made base on quantity take-off referring to unit cost analysis standard in detail and conceptual. The construction phase start on January 4th 2021 until March 29th2023 or estimated to be completed by 575 workdays and total cost requires is Rp418.827.031.526,00. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Fulfillment and quality improvement of inter-location connectivity in Indonesia,
especially for passengers, can be realized through trip by high speed railway as the
mode of transportation and station as the required transportation infrastructure.
This final assignment will provide discussion regarding the planning and
implementation of Tegalluar High Speed Railways Station. This planning and
implementation includes construction method, construction cost estimation,
quantity take-off, and project construction schedule. Construction object scope
include station building structure, foundation, retaining wall (tunnel), parking
pavement, drainage, and station architectural. The construction stages begin from
soil improvement, then foundation and retaining wall construction, upper structure,
and then the station landscape construction. Construction cost estimation made
base on quantity take-off referring to unit cost analysis standard in detail and
conceptual. The construction phase start on January 4th 2021 until March 29th2023
or estimated to be completed by 575 workdays and total cost requires is
Rp418.827.031.526,00.
|
format |
Final Project |
author |
Hafidh, Muhammad |
spellingShingle |
Hafidh, Muhammad METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION |
author_facet |
Hafidh, Muhammad |
author_sort |
Hafidh, Muhammad |
title |
METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION |
title_short |
METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION |
title_full |
METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION |
title_fullStr |
METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION |
title_full_unstemmed |
METHOD AND COST ESTIMATION DESIGN OF TEGALLUAR HIGH SPEED RAILWAYS STATION |
title_sort |
method and cost estimation design of tegalluar high speed railways station |
url |
https://digilib.itb.ac.id/gdl/view/54154 |
_version_ |
1822929524476608512 |