MODEL PENENTUAN UKURAN LOT DAN REDUKSI ONGKOS SETUP UNTUK PRODUK BERSTRUKTUR MULTI-LEVEL
<b>Abstract :</b><p align=\"justify\"> <br /> This research discusses a model of lot sizing and setup cost reduction for multi-level structure in just-in-time (JIT) environment production system. The model shows that there is a trade off between investment cost and...
Saved in:
Main Author: | Kholidasari, Inna |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/5424 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Period decompositions for the capacitated lot size problem with setup times
by: DE ARAUJO, Silvio Alexandre, et al.
Published: (2015) -
MODEL INTEGRASI PENENTUAN UKURAN LOT GABUNGANPEMBELI-PEMANUFAKTUR-PEMASOK DENGANUKURAN PENGIRIMAN SAMA-DAN-BERBEDA
by: Eko Wiratno, Stefanus -
ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON
by: OH HONG CHOON
Published: (2019) -
ECONOMIC LOT SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUPS AND FIXED PLANNING HORIZON
by: OH HONG CHOON
Published: (2019) -
A horizon decomposition approach for the capacitated lot-sizing problem with setup times
by: FRAGKOS, Ioannis, et al.
Published: (2016)