LAYOUT DESIGN AND DREDGING PROJECT FOR APPROACH CHANNEL AND TURNING BASIN AT KIJING TERMINAL PONTIANAK PORT
Kijing Terminal was built to ease the burden on the Pontianak Main Port because of its narrow location and loading and unloading flows that exceed the port capacity, the plan for the Beijing Terminal to be the largest modern port in Kalimantan.. Facilities to be used include approach channel and tur...
Saved in:
Main Author: | Zuaevi, Nabil |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/54247 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
LAYOUT DESIGN AND DREDGING PROJECT FOR APPROACH CHANNEL AND TURNING BASIN AT MAKASSAR NEW PORT
by: Wicaksana Kurniawan, Stefanus -
LAYOUT DESIGN AND DREDGING PROJECT FOR APPROACH CHANNEL AND TURNING BASIN AT PATIMBAN PORT STAGE 1 PHASE 1
by: Jatmika Zamzam Rifai, Rizki -
LAYOUT DESIGN AND DREDGING WORKS FOR NAVIGATION CHANNEL AND TURNING BASIN OF KENDARI NEW PORT
by: Ramadhani, Rania -
LAYOUT DESIGN AND DREDGING PROJECT OF NAVIGATION CHANNEL AND TURNING BASIN AT SEI BEROMBANG PORT NORTH SUMATERA PROVINCE
by: Ihsanil Arsyad, Muhammad -
LAYOUT DESIGN AND DREDGING PROJECT FOR NAVIGATION CHANNEL AND TURNING BASIN AT KUALA TANJUNG MULTIPURPOSE TERMINAL, NORTH SUMATRA
by: Yuni Pratiwi, Riska