OPTIMATION OF LOADING AND HAULING COSTS WITH LINEAR PROGRAMING METHOD IN QUARRY D PT. ABC
In an order to minimize loading-transportation costs and maximize production yields, a mining process is needed that runs effectively and efficiently. At PT. ABC Kuari D, the mining process is still not effective and efficient, especially the loading and transportation of limestone from the front to...
Saved in:
Main Author: | Iqbal, Muhamad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/54391 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMIZATION OF THE NUMBER OF DUMP TRUCKS USING QUEUING THEORY TO MINIMIZE THE LOADING AND HAULING COST OF OVERBURDEN AT BATU HIJAU MINE PT AMMAN MINERAL NUSA TENGGARA
by: Widjaja, Michael -
DESIGN OF PUMPING SYSTEM AND SETTLING POND IN QUARRY A PT INDOCEMENT TUNGGAL PRAKARSA PALIMANAN
by: Muhammad Ibrahim, Tubagus -
MINE DRAINAGE FACILITIES PLANNING IN QUARRY A AND DUMP 1 PT INDOCEMENT TUNGGAL PRAKARSA PALIMANAN
by: Riga Ambardani, Kharisma -
DEVELOPMENT OF SPATIAL DATABASE OF GOLD DEPOSITE AND QUARRY POTENTIALS IN RELATION WITH THE LAND USE AND RECOMMENDATIONS OF MINING CONCEPTS IN BANTEN PROVINCE
by: HAQIQI (NIM : 12113083), MAULANA -
APPLICATION OF Q-SLOPE METHOD IN SLOPE STABILITY ANALYSIS: CASE STUDY OF SINGLE SLOPE QUARRY A PT INDOCEMENT TUNGGAL PRAKARSA TBK. PLANT PALIMANAN, CIREBON DISTRICT, WEST JAVA
by: Saoma Ramadhan, Aziz