COMPARATION ANALYSIS OF EMBANKMENT CONSTRUCTION MATERIAL LOADING AND HAULING WITH BELT CONVEYOR AND DOUBLE TRAILER BASED ON ECONOMIC VALUE AT PT XYZ, MIMIKA REGENCY, PAPUA PROVINCE

PT XYZ is a company that operates in construction and mining sector with Area of Mining Business License (WIUP) located in Mimika Regency, Papua Province. PT XYZ will construct a cross embankment on south of WIUP that needs granular-fill as main material. Granular-fill is obtained from mining act...

Full description

Saved in:
Bibliographic Details
Main Author: Michael Britonis, Daeli
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/54397
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:54397
spelling id-itb.:543972021-03-16T13:43:10ZCOMPARATION ANALYSIS OF EMBANKMENT CONSTRUCTION MATERIAL LOADING AND HAULING WITH BELT CONVEYOR AND DOUBLE TRAILER BASED ON ECONOMIC VALUE AT PT XYZ, MIMIKA REGENCY, PAPUA PROVINCE Michael Britonis, Daeli, Indonesia Final Project Granular-fill, Quarry, Double trailer, Belt conveyor, Capital cost, Operating cost INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54397 PT XYZ is a company that operates in construction and mining sector with Area of Mining Business License (WIUP) located in Mimika Regency, Papua Province. PT XYZ will construct a cross embankment on south of WIUP that needs granular-fill as main material. Granular-fill is obtained from mining activity with quarry method on north of WIUP. Therefore, hauling material process is needed from mining area to the location of cross embankment. Two kinds of hauling method, consist of double trailer and belt conveyor hauler are analyzed to find the most economic one. Distances of main hauling way are 43,2 km using double trailer and 42,6 km with belt conveyor. In analyzing economic level, capital cost and operating cost become major consideration. Total cost of double trailer hauling method consist of buying and using 7 unit wheel loader and 12 unit double trailer as main unit and 1 unit motor grader and 1 unit water truck as supporting unit based on necesarry as much as US$ 60.943.059. Meanwhile, total cost of belt conveyor hauling method consist of buying and using 7 unit wheel loader and 4250 set belt conveyor as main unit and 5 transfer point location as supporting based on necesarry as much as US$ 77.546.471. Based on result of total cost calculation, Hauling using double trailer results lower economic expense than using belt conveyor. It is because cheaper capital cost if compared with using belt conveyor, although in the other side operating cost of belt conveyor results lower economic expense. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT XYZ is a company that operates in construction and mining sector with Area of Mining Business License (WIUP) located in Mimika Regency, Papua Province. PT XYZ will construct a cross embankment on south of WIUP that needs granular-fill as main material. Granular-fill is obtained from mining activity with quarry method on north of WIUP. Therefore, hauling material process is needed from mining area to the location of cross embankment. Two kinds of hauling method, consist of double trailer and belt conveyor hauler are analyzed to find the most economic one. Distances of main hauling way are 43,2 km using double trailer and 42,6 km with belt conveyor. In analyzing economic level, capital cost and operating cost become major consideration. Total cost of double trailer hauling method consist of buying and using 7 unit wheel loader and 12 unit double trailer as main unit and 1 unit motor grader and 1 unit water truck as supporting unit based on necesarry as much as US$ 60.943.059. Meanwhile, total cost of belt conveyor hauling method consist of buying and using 7 unit wheel loader and 4250 set belt conveyor as main unit and 5 transfer point location as supporting based on necesarry as much as US$ 77.546.471. Based on result of total cost calculation, Hauling using double trailer results lower economic expense than using belt conveyor. It is because cheaper capital cost if compared with using belt conveyor, although in the other side operating cost of belt conveyor results lower economic expense.
format Final Project
author Michael Britonis, Daeli,
spellingShingle Michael Britonis, Daeli,
COMPARATION ANALYSIS OF EMBANKMENT CONSTRUCTION MATERIAL LOADING AND HAULING WITH BELT CONVEYOR AND DOUBLE TRAILER BASED ON ECONOMIC VALUE AT PT XYZ, MIMIKA REGENCY, PAPUA PROVINCE
author_facet Michael Britonis, Daeli,
author_sort Michael Britonis, Daeli,
title COMPARATION ANALYSIS OF EMBANKMENT CONSTRUCTION MATERIAL LOADING AND HAULING WITH BELT CONVEYOR AND DOUBLE TRAILER BASED ON ECONOMIC VALUE AT PT XYZ, MIMIKA REGENCY, PAPUA PROVINCE
title_short COMPARATION ANALYSIS OF EMBANKMENT CONSTRUCTION MATERIAL LOADING AND HAULING WITH BELT CONVEYOR AND DOUBLE TRAILER BASED ON ECONOMIC VALUE AT PT XYZ, MIMIKA REGENCY, PAPUA PROVINCE
title_full COMPARATION ANALYSIS OF EMBANKMENT CONSTRUCTION MATERIAL LOADING AND HAULING WITH BELT CONVEYOR AND DOUBLE TRAILER BASED ON ECONOMIC VALUE AT PT XYZ, MIMIKA REGENCY, PAPUA PROVINCE
title_fullStr COMPARATION ANALYSIS OF EMBANKMENT CONSTRUCTION MATERIAL LOADING AND HAULING WITH BELT CONVEYOR AND DOUBLE TRAILER BASED ON ECONOMIC VALUE AT PT XYZ, MIMIKA REGENCY, PAPUA PROVINCE
title_full_unstemmed COMPARATION ANALYSIS OF EMBANKMENT CONSTRUCTION MATERIAL LOADING AND HAULING WITH BELT CONVEYOR AND DOUBLE TRAILER BASED ON ECONOMIC VALUE AT PT XYZ, MIMIKA REGENCY, PAPUA PROVINCE
title_sort comparation analysis of embankment construction material loading and hauling with belt conveyor and double trailer based on economic value at pt xyz, mimika regency, papua province
url https://digilib.itb.ac.id/gdl/view/54397
_version_ 1822929597349494784