BYPASS CHANNEL AS A CONTROL FOR QUANTITY AND QUALITY OF WATER THAT ENTER THE WEST COASTAL RESERVOIR IN THE NCICD/IFSP 2019 MASTERPLAN

In various master plans for Jakarta Bay flood control since NCICD in 2014 to IFSP in 2019, it is shown that the Coastal Reservoir (CR) become an important component to be built. The problem is that the CR in the master plan is a closed system, so that regardless of the volume of river water going...

Full description

Saved in:
Bibliographic Details
Main Author: Hatuaon Marpaung, Aron
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/54429
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:54429
spelling id-itb.:544292021-03-16T17:23:30ZBYPASS CHANNEL AS A CONTROL FOR QUANTITY AND QUALITY OF WATER THAT ENTER THE WEST COASTAL RESERVOIR IN THE NCICD/IFSP 2019 MASTERPLAN Hatuaon Marpaung, Aron Indonesia Theses NCICD, IFSP, coastal reservoir, bypass channel INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54429 In various master plans for Jakarta Bay flood control since NCICD in 2014 to IFSP in 2019, it is shown that the Coastal Reservoir (CR) become an important component to be built. The problem is that the CR in the master plan is a closed system, so that regardless of the volume of river water going into the CR, it cannot be diverted to another place by gravity. As a result, a large capacity of pump is required to remove excess water. If the pump is damaged, even though the gate is available, the gate connected with the roller gate and shiplock, making it complicated to operate and the CR is vulnerable to seawater intrusion. The condition that cannot be prevented is the quality of the incoming river water that being polluted during an environmental disaster, then the polluted river water flowing to the system. Learnt from the Lake Shiwa in South Korea disaster, for the pre-design stage B of IFSP 2019, a bypass channel (BC) is recommended. By regulating the quantity and quality of water in BC, CR water quality is more guaranteed and the pump operating costs will not be needed because the unnecessary water can be flowed directly to the sea. To prevent flooding that will occur on the reclamation island at (+) 2.00 m, it will need 3 doors in BC. The maximum water elevation of BC when the peak discharge of Cengkareng Drain and BKB reaches (+) 0.96 m. If the CR is simulated to experience a dam break, the maximum water elevation BC (+) is 0.80 m. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In various master plans for Jakarta Bay flood control since NCICD in 2014 to IFSP in 2019, it is shown that the Coastal Reservoir (CR) become an important component to be built. The problem is that the CR in the master plan is a closed system, so that regardless of the volume of river water going into the CR, it cannot be diverted to another place by gravity. As a result, a large capacity of pump is required to remove excess water. If the pump is damaged, even though the gate is available, the gate connected with the roller gate and shiplock, making it complicated to operate and the CR is vulnerable to seawater intrusion. The condition that cannot be prevented is the quality of the incoming river water that being polluted during an environmental disaster, then the polluted river water flowing to the system. Learnt from the Lake Shiwa in South Korea disaster, for the pre-design stage B of IFSP 2019, a bypass channel (BC) is recommended. By regulating the quantity and quality of water in BC, CR water quality is more guaranteed and the pump operating costs will not be needed because the unnecessary water can be flowed directly to the sea. To prevent flooding that will occur on the reclamation island at (+) 2.00 m, it will need 3 doors in BC. The maximum water elevation of BC when the peak discharge of Cengkareng Drain and BKB reaches (+) 0.96 m. If the CR is simulated to experience a dam break, the maximum water elevation BC (+) is 0.80 m.
format Theses
author Hatuaon Marpaung, Aron
spellingShingle Hatuaon Marpaung, Aron
BYPASS CHANNEL AS A CONTROL FOR QUANTITY AND QUALITY OF WATER THAT ENTER THE WEST COASTAL RESERVOIR IN THE NCICD/IFSP 2019 MASTERPLAN
author_facet Hatuaon Marpaung, Aron
author_sort Hatuaon Marpaung, Aron
title BYPASS CHANNEL AS A CONTROL FOR QUANTITY AND QUALITY OF WATER THAT ENTER THE WEST COASTAL RESERVOIR IN THE NCICD/IFSP 2019 MASTERPLAN
title_short BYPASS CHANNEL AS A CONTROL FOR QUANTITY AND QUALITY OF WATER THAT ENTER THE WEST COASTAL RESERVOIR IN THE NCICD/IFSP 2019 MASTERPLAN
title_full BYPASS CHANNEL AS A CONTROL FOR QUANTITY AND QUALITY OF WATER THAT ENTER THE WEST COASTAL RESERVOIR IN THE NCICD/IFSP 2019 MASTERPLAN
title_fullStr BYPASS CHANNEL AS A CONTROL FOR QUANTITY AND QUALITY OF WATER THAT ENTER THE WEST COASTAL RESERVOIR IN THE NCICD/IFSP 2019 MASTERPLAN
title_full_unstemmed BYPASS CHANNEL AS A CONTROL FOR QUANTITY AND QUALITY OF WATER THAT ENTER THE WEST COASTAL RESERVOIR IN THE NCICD/IFSP 2019 MASTERPLAN
title_sort bypass channel as a control for quantity and quality of water that enter the west coastal reservoir in the ncicd/ifsp 2019 masterplan
url https://digilib.itb.ac.id/gdl/view/54429
_version_ 1822929607218692096