BYPASS CHANNEL AS A CONTROL FOR QUANTITY AND QUALITY OF WATER THAT ENTER THE WEST COASTAL RESERVOIR IN THE NCICD/IFSP 2019 MASTERPLAN
In various master plans for Jakarta Bay flood control since NCICD in 2014 to IFSP in 2019, it is shown that the Coastal Reservoir (CR) become an important component to be built. The problem is that the CR in the master plan is a closed system, so that regardless of the volume of river water going...
Saved in:
Main Author: | Hatuaon Marpaung, Aron |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/54429 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
GSW, NCICD, coastal economic activity, Risk Assessment Matrix
by: Abdul Khalik, Dinan -
Intrahepatic segment V biliary enteric bypass
by: Tan, L.B.K., et al.
Published: (2016) -
EVALUASI MASTERPLAN PELABUHAN MAUMERE
by: , DEDI IMANUEL PAU, et al.
Published: (2013) -
Leadership styles and the implementation of the IT masterplan
by: Chan, Linda Ngiap Koon.
Published: (2008) -
Malabon step-up masterplan
by: Omana, Terteen Gail B., et al.
Published: (2004)