PANJANG WAKTU PRODUKSI DAN PERBAIKAN PROSES OPTIMAL UNTUK SISTEM YANG MENGALAMI DETERIORASI
<b>Abstract</b>: <p align=\"justify\"> <br /> <br /> This research develops a model for determining a production run length and process improvement for a deteriorating system. The production process of the system may go from in control state to out of contr...
Saved in:
Main Author: | Riski |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/5453 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALISA NUMERIK PERILAKU BUCKLING PADA REL PANJANG
by: Ibrahim , Yoseph -
PERANCANGAN, PEMBUATAN DAN PENGUJIAN MODEL AEROELASTIS PENAMPANG JEMBATAN BENTANG PANJANG
by: Sangadji, Senot -
PENENTUAN KOMBINASI WAKTU BEKERJA DAN WAKTU PEREGANGAN BAGI PENGGUNA KOMPUTER (STUDI KASUS KARYAWAN SEKRETARIAT JURUSAN)
by: Henny -
PENGEMBANGAN PERANGKAT LUNAK SISTEM PEMROSESAN DATA UJI TERBANG AIRBORNE INSTRUMENTATION SYSTEM DALAM WAKTU NYATA (BAGIAN PEMROSESAN DAN PENYAJIAN DATA)
by: Marzuki Shofi (NIM : 23598034), Imam -
ANALISIS STATIK PERBAIKAN STRUKTUR PELAT-BERPENGUAT MELALUI PERHITUNGAN NUMERIK DAN PENGUJIAN
by: Hidayat, Wahyu