MODEL INTEGRASI PENENTUAN UKURAN LOT GABUNGANPEMBELI-PEMANUFAKTUR-PEMASOK DENGANUKURAN PENGIRIMAN SAMA-DAN-BERBEDA
<p>Abstract:<p align="justify"> <br /> This research presents a problem of determining joint economic lot sizes for buyer-manufacturersupplier. A manufacturer orders raw materials from a supplier, converts the raw materials to finished goods, and finally delivers the fin...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/5460 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:5460 |
---|---|
spelling |
id-itb.:54602006-03-02T07:34:45ZMODEL INTEGRASI PENENTUAN UKURAN LOT GABUNGANPEMBELI-PEMANUFAKTUR-PEMASOK DENGANUKURAN PENGIRIMAN SAMA-DAN-BERBEDA Eko Wiratno, Stefanus Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/5460 <p>Abstract:<p align="justify"> <br /> This research presents a problem of determining joint economic lot sizes for buyer-manufacturersupplier. A manufacturer orders raw materials from a supplier, converts the raw materials to finished goods, and finally delivers the finished goods to a buyer. The manufacturer produces the finished good in batches at a finite rate and delivers finished goods with equal-and-unequal sizes to buyer to satisfy a constant demand rate.<p align="justify"> <br /> An integrated model of determining joint economic lot size for buyer-manufacturer-supplier is developed to obtain a good global solution for all tiers. The objective of the model is to minimize the total joint annual cost incurred by the buyer, the manufacturer, and the supplier. The approach used in this research is an analytical approach.<p align="justify"> <br /> The outcomes of the research confirm the policy of buyer-manufacturer-supplier integration and could provide a better system performance instead of partial policy. Finished product shipment policy from manufacturer to buyer with equal-and-unequal size results smaller total joint annual cost, comparing to equal or unequal size shipment. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
<p>Abstract:<p align="justify"> <br />
This research presents a problem of determining joint economic lot sizes for buyer-manufacturersupplier. A manufacturer orders raw materials from a supplier, converts the raw materials to finished goods, and finally delivers the finished goods to a buyer. The manufacturer produces the finished good in batches at a finite rate and delivers finished goods with equal-and-unequal sizes to buyer to satisfy a constant demand rate.<p align="justify"> <br />
An integrated model of determining joint economic lot size for buyer-manufacturer-supplier is developed to obtain a good global solution for all tiers. The objective of the model is to minimize the total joint annual cost incurred by the buyer, the manufacturer, and the supplier. The approach used in this research is an analytical approach.<p align="justify"> <br />
The outcomes of the research confirm the policy of buyer-manufacturer-supplier integration and could provide a better system performance instead of partial policy. Finished product shipment policy from manufacturer to buyer with equal-and-unequal size results smaller total joint annual cost, comparing to equal or unequal size shipment. |
format |
Theses |
author |
Eko Wiratno, Stefanus |
spellingShingle |
Eko Wiratno, Stefanus MODEL INTEGRASI PENENTUAN UKURAN LOT GABUNGANPEMBELI-PEMANUFAKTUR-PEMASOK DENGANUKURAN PENGIRIMAN SAMA-DAN-BERBEDA |
author_facet |
Eko Wiratno, Stefanus |
author_sort |
Eko Wiratno, Stefanus |
title |
MODEL INTEGRASI PENENTUAN UKURAN LOT GABUNGANPEMBELI-PEMANUFAKTUR-PEMASOK DENGANUKURAN PENGIRIMAN SAMA-DAN-BERBEDA |
title_short |
MODEL INTEGRASI PENENTUAN UKURAN LOT GABUNGANPEMBELI-PEMANUFAKTUR-PEMASOK DENGANUKURAN PENGIRIMAN SAMA-DAN-BERBEDA |
title_full |
MODEL INTEGRASI PENENTUAN UKURAN LOT GABUNGANPEMBELI-PEMANUFAKTUR-PEMASOK DENGANUKURAN PENGIRIMAN SAMA-DAN-BERBEDA |
title_fullStr |
MODEL INTEGRASI PENENTUAN UKURAN LOT GABUNGANPEMBELI-PEMANUFAKTUR-PEMASOK DENGANUKURAN PENGIRIMAN SAMA-DAN-BERBEDA |
title_full_unstemmed |
MODEL INTEGRASI PENENTUAN UKURAN LOT GABUNGANPEMBELI-PEMANUFAKTUR-PEMASOK DENGANUKURAN PENGIRIMAN SAMA-DAN-BERBEDA |
title_sort |
model integrasi penentuan ukuran lot gabunganpembeli-pemanufaktur-pemasok denganukuran pengiriman sama-dan-berbeda |
url |
https://digilib.itb.ac.id/gdl/view/5460 |
_version_ |
1820663692304318464 |