Bauxite mining operation is a kind of operation that have high risk in technical and economic aspect. PT ABC is planning to develop a new pit in the mine permit area of 790 hectar and has bauxite resources of 7,954,009.539 tons and bauxite reserves of 5,339,844.53 tons. For this development, PT ABC...

Full description

Saved in:
Bibliographic Details
Main Author: Liunardi, Sundharsen
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/54606
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:54606
spelling id-itb.:546062021-04-13T10:28:43ZPERENCANAAN TAMBANG BAUKSIT PT ABC Liunardi, Sundharsen Indonesia Final Project mining feasibility analysis, NPV, IRR, payback period INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54606 Bauxite mining operation is a kind of operation that have high risk in technical and economic aspect. PT ABC is planning to develop a new pit in the mine permit area of 790 hectar and has bauxite resources of 7,954,009.539 tons and bauxite reserves of 5,339,844.53 tons. For this development, PT ABC will produce 1,1 million tons of bauxite per year with cut off grade of Al2O3 minimum 40% and cut off grade of RSiO2 maximum 5.8%. This study is purposed to determine the mining feasibility of PT ABC and to know the effect of changes in total production on the company's economic analysis. Bauxite mining project conducted by PT ABC is economically feasible to run. PT ABC has NPV of $ 30,572,958.76, IRR of 37,25% and payback period has been achieved in the third year. The project of PT ABC has NPV equal to zero when total production of bauxite decreases to ± 730,000 tons per year and has IRR equal to zero when total production of bauxite decreases to ± 632,000 tons per year. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Bauxite mining operation is a kind of operation that have high risk in technical and economic aspect. PT ABC is planning to develop a new pit in the mine permit area of 790 hectar and has bauxite resources of 7,954,009.539 tons and bauxite reserves of 5,339,844.53 tons. For this development, PT ABC will produce 1,1 million tons of bauxite per year with cut off grade of Al2O3 minimum 40% and cut off grade of RSiO2 maximum 5.8%. This study is purposed to determine the mining feasibility of PT ABC and to know the effect of changes in total production on the company's economic analysis. Bauxite mining project conducted by PT ABC is economically feasible to run. PT ABC has NPV of $ 30,572,958.76, IRR of 37,25% and payback period has been achieved in the third year. The project of PT ABC has NPV equal to zero when total production of bauxite decreases to ± 730,000 tons per year and has IRR equal to zero when total production of bauxite decreases to ± 632,000 tons per year.
format Final Project
author Liunardi, Sundharsen
spellingShingle Liunardi, Sundharsen
PERENCANAAN TAMBANG BAUKSIT PT ABC
author_facet Liunardi, Sundharsen
author_sort Liunardi, Sundharsen
title PERENCANAAN TAMBANG BAUKSIT PT ABC
title_short PERENCANAAN TAMBANG BAUKSIT PT ABC
title_full PERENCANAAN TAMBANG BAUKSIT PT ABC
title_fullStr PERENCANAAN TAMBANG BAUKSIT PT ABC
title_full_unstemmed PERENCANAAN TAMBANG BAUKSIT PT ABC
title_sort perencanaan tambang bauksit pt abc
url https://digilib.itb.ac.id/gdl/view/54606
_version_ 1822929663134007296