COST ANALYSIS OF OUTSOURCING STRATEGY BY CVP METHOD IN MAINTENANCE TEAM OIL AND GAS COMPANY
Currently Maintenance team having limited resource loading to support daily Operation activities, the impact is it will late to provide response time and increase maintenance cost for corrective job. In line with Company strategy, the position for retired maintenance employee (low grade tchnician)...
Saved in:
Main Author: | Nugroho |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/54858 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
COST ANALYSIS OF OUTSOURCING STRATEGY BY CVP METHOD IN MAINTENANCE TEAM OIL AND GAS COMPANY
by: Nugroho -
MAINTENANCE STRATEGY FOR AGING FACILITIES OF OIL AND GAS COMPANY
by: Hadinata Lumban Gaol, Esron -
OUTSOURCING (FIELD CHECKER) COMPETENCY ASSESSMENT AND IMPROVEMENT STRATEGY AS SUBSTITUTION FOR OIL & GAS COMPANYâS FIELD OPERATOR
by: Adjie, Billy -
PROPOSED STRATEGY BY MRO OPTIMIZATION IN COST- EFFECTIVE PROGRAMME OF AN OIL AND GAS COMPANY IN THE MIDDLE EAST BY USING KEPNER-TREGOE ANALYSIS AND ANALYTICAL HIERARCHY PROCESS (AHP)
by: Yona Ariawan, MM -
SOLUTIONS TO PERFORM COST-EFFICIENCY PROGRAM IN BROWNFIELD LNG COMPANY WITHOUT COMPROMISING THE COMPANY KPI RELATED TO PLANT RELIABILITY BY IMPROVING THE CURRENT MAINTENANCE STRATEGY
by: Yudha, Erlangga