PROJECT COST OVERRUN ANALYSIS CASE STUDY: A ROTATING EQUIPMENT SERVICES COMPANY (PT Z)
PT Z is a multinational company based in one of the cities in West Java dealing with rotating equipment services. The company has a profitability issue due to the cost overrun of the projects they executed. The total cost overrun in 2020 is about 21.6 billion Rupiahs that was contributed from 3 (t...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/57409 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |