PROJECT COST OVERRUN ANALYSIS CASE STUDY: A ROTATING EQUIPMENT SERVICES COMPANY (PT Z)
PT Z is a multinational company based in one of the cities in West Java dealing with rotating equipment services. The company has a profitability issue due to the cost overrun of the projects they executed. The total cost overrun in 2020 is about 21.6 billion Rupiahs that was contributed from 3 (t...
Saved in:
Main Author: | Hanipa, Hepy |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/57409 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BUDGET ESTIMATION TECHNIQUE ON ROTATING EQUIPMENT SERVICE WORKSHOP AT PT. RES.
by: Slamet Wiharjo, Iman -
PROBLEM-SOLVING AND ALTERNATIVE SELECTION TO COST OVERRUN OF COVID-19 MANAGEMENT IN PT JAYA INDUSTRI TANI IN THE FIRST SEMESTER OF 2021
by: Ari Fitriani, Zukhrida -
ANALYSIS ON THE IMPACT OF COMPANY EMPLOYER BRANDING WITH THE DESIRE OF GENERATION Z IN CHOOSING THEIR WORKPLACE: A CASE STUDY OF PT BRI
by: Amanatullah Agnar, Auzan -
PROPOSED STRATEGY FOR THE DEVELOPMENT OF TURBOMACHINERY EQUIPMENT SERVICE BUSINESS IN INDONESIA (CASE STUDY: PT TAKA TURBOMACHINERY INDONESIA)
by: Annisa Mandasari, Sitti -
PROPOSAL TO IMPLEMENT RCM (FMEA & LTA ) APPROACH IN SELECTION MAINTENANCE TASK OF ROTATING EQUIPMENT HYDROGEN MAKE UP COMPRESSOR PT XYZ
by: Unitrya, Rio