UPAYA PENINGKATAN EFFEKTIFITAS REGU OPERATOR UNIT PEMBANGKIT TENAGA LISTRIK (STUDI KASUS PADA UNIT PEMBANGKIT MUARA KARANG)

<b></i>Abstract : </b><i><p align=\"justify\"> <br /> PT PJB is a Power Generation Company, providing electric power for Java Bali Network System is their core business. Unit Pembangkit Muara Karang (UPMKR) is an organization unit of PT PJB, that manage...

Full description

Saved in:
Bibliographic Details
Main Author: Sudarmanta (NIM 28199005), Bernadus
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/5490
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:5490
spelling id-itb.:54902006-06-15T09:04:07ZUPAYA PENINGKATAN EFFEKTIFITAS REGU OPERATOR UNIT PEMBANGKIT TENAGA LISTRIK (STUDI KASUS PADA UNIT PEMBANGKIT MUARA KARANG) Sudarmanta (NIM 28199005), Bernadus Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/5490 <b></i>Abstract : </b><i><p align=\"justify\"> <br /> PT PJB is a Power Generation Company, providing electric power for Java Bali Network System is their core business. Unit Pembangkit Muara Karang (UPMKR) is an organization unit of PT PJB, that managed some entities of power plant unit, that is Combine Cycle Power Plant and Steam Turbine Generator Plant located in Muara Karang and Muara Tawar. <br /> <p align=\"justify\">Power plant operators is work groups organized to operate power plant reliably and efficiently all the time (24 hours/ day), hence firm objective to provide electric power reliably and efficiently is directly rely on operator organization effectiveness. <br /> <p align=\"justify\">PT PJB\'s management attempted to restructured their many aspects of organization and business process since 1997. One of the aspects to be restructured was organization structure by separating Operation function and Maintenance function. The consequence of the restructuring is major maintenance activity held by Maintenance Business Unit then operation and minor maintenance activity manage by Power Plant Unit Organization and held by operator group organization. <br /> <p align=\"justify\">Case of UPMKR Organization, in recently years after restructuring organization the UPMKR\'s performance tend to declined, UPMKR\'s operator as a components of UPMKR organization should have any contribution to performance declining. This paper dedicated to look up current roles of the UPMKR\'s operator organizations and what they can do to improve UPMKR performances. <br /> <p align=\"justify\">According to the result of study found that UPMKR\'s operator effectiveness in Group level is fair good but in organization level or inter group effectiveness is poor. Observation of previous organization structure and process concluded that operator group used to be independent work groups. <br /> <p align=\"justify\">Independence of operator groups became a barrier when Operator Organization will be change by empowerment or by job enlargement and enrichment, since it\'s mean require a better coordination among the operator work groups. <br /> <p align=\"justify\">As a proposal to solve the problem of UPMKR\'s Operator Organization, To improve the coordination system among the operator groups, proposed to forming a coordination team and considering all of implications of forming the coordination team. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <b></i>Abstract : </b><i><p align=\"justify\"> <br /> PT PJB is a Power Generation Company, providing electric power for Java Bali Network System is their core business. Unit Pembangkit Muara Karang (UPMKR) is an organization unit of PT PJB, that managed some entities of power plant unit, that is Combine Cycle Power Plant and Steam Turbine Generator Plant located in Muara Karang and Muara Tawar. <br /> <p align=\"justify\">Power plant operators is work groups organized to operate power plant reliably and efficiently all the time (24 hours/ day), hence firm objective to provide electric power reliably and efficiently is directly rely on operator organization effectiveness. <br /> <p align=\"justify\">PT PJB\'s management attempted to restructured their many aspects of organization and business process since 1997. One of the aspects to be restructured was organization structure by separating Operation function and Maintenance function. The consequence of the restructuring is major maintenance activity held by Maintenance Business Unit then operation and minor maintenance activity manage by Power Plant Unit Organization and held by operator group organization. <br /> <p align=\"justify\">Case of UPMKR Organization, in recently years after restructuring organization the UPMKR\'s performance tend to declined, UPMKR\'s operator as a components of UPMKR organization should have any contribution to performance declining. This paper dedicated to look up current roles of the UPMKR\'s operator organizations and what they can do to improve UPMKR performances. <br /> <p align=\"justify\">According to the result of study found that UPMKR\'s operator effectiveness in Group level is fair good but in organization level or inter group effectiveness is poor. Observation of previous organization structure and process concluded that operator group used to be independent work groups. <br /> <p align=\"justify\">Independence of operator groups became a barrier when Operator Organization will be change by empowerment or by job enlargement and enrichment, since it\'s mean require a better coordination among the operator work groups. <br /> <p align=\"justify\">As a proposal to solve the problem of UPMKR\'s Operator Organization, To improve the coordination system among the operator groups, proposed to forming a coordination team and considering all of implications of forming the coordination team.
format Theses
author Sudarmanta (NIM 28199005), Bernadus
spellingShingle Sudarmanta (NIM 28199005), Bernadus
UPAYA PENINGKATAN EFFEKTIFITAS REGU OPERATOR UNIT PEMBANGKIT TENAGA LISTRIK (STUDI KASUS PADA UNIT PEMBANGKIT MUARA KARANG)
author_facet Sudarmanta (NIM 28199005), Bernadus
author_sort Sudarmanta (NIM 28199005), Bernadus
title UPAYA PENINGKATAN EFFEKTIFITAS REGU OPERATOR UNIT PEMBANGKIT TENAGA LISTRIK (STUDI KASUS PADA UNIT PEMBANGKIT MUARA KARANG)
title_short UPAYA PENINGKATAN EFFEKTIFITAS REGU OPERATOR UNIT PEMBANGKIT TENAGA LISTRIK (STUDI KASUS PADA UNIT PEMBANGKIT MUARA KARANG)
title_full UPAYA PENINGKATAN EFFEKTIFITAS REGU OPERATOR UNIT PEMBANGKIT TENAGA LISTRIK (STUDI KASUS PADA UNIT PEMBANGKIT MUARA KARANG)
title_fullStr UPAYA PENINGKATAN EFFEKTIFITAS REGU OPERATOR UNIT PEMBANGKIT TENAGA LISTRIK (STUDI KASUS PADA UNIT PEMBANGKIT MUARA KARANG)
title_full_unstemmed UPAYA PENINGKATAN EFFEKTIFITAS REGU OPERATOR UNIT PEMBANGKIT TENAGA LISTRIK (STUDI KASUS PADA UNIT PEMBANGKIT MUARA KARANG)
title_sort upaya peningkatan effektifitas regu operator unit pembangkit tenaga listrik (studi kasus pada unit pembangkit muara karang)
url https://digilib.itb.ac.id/gdl/view/5490
_version_ 1820663700632109056