RISK MODEL ANALYSIS AND CALCULATION OF PURE PREMIUM ON OCCUPATIONAL SAFETY INSURANCE IN BRIDGE CONSTRUCTION PROJECTS USING GENERALIZED LINIEER MODELS
The high rate of work accidents experienced by construction workers can imply with various kinds of losses such as delays in project completion and the large costs incurred to pay for the care of these workers. There is uncertainty in the amount of costs that must occur when a work accident occur...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/54929 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:54929 |
---|---|
spelling |
id-itb.:549292021-06-10T12:49:47ZRISK MODEL ANALYSIS AND CALCULATION OF PURE PREMIUM ON OCCUPATIONAL SAFETY INSURANCE IN BRIDGE CONSTRUCTION PROJECTS USING GENERALIZED LINIEER MODELS Amaliyah Maryama, Andi Indonesia Theses GLM, working accidents, construction project. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/54929 The high rate of work accidents experienced by construction workers can imply with various kinds of losses such as delays in project completion and the large costs incurred to pay for the care of these workers. There is uncertainty in the amount of costs that must occur when a work accident occurs, therefore the author will do a modeling with the GLM method which can estimate the probability of workers having an accident in the work process by considering the factors of age, weight and length of work experience. The data used are data obtained from PT. PP Persero for the Kendari Bay Bridge project. The results show that the insurance premium obtained is feasible to offer because it is smaller than what must be notified if the company does not follow work accident insurance text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The high rate of work accidents experienced by construction workers can imply
with various kinds of losses such as delays in project completion and the large costs
incurred to pay for the care of these workers. There is uncertainty in the amount of
costs that must occur when a work accident occurs, therefore the author will do a
modeling with the GLM method which can estimate the probability of workers
having an accident in the work process by considering the factors of age, weight
and length of work experience. The data used are data obtained from PT. PP Persero
for the Kendari Bay Bridge project. The results show that the insurance premium
obtained is feasible to offer because it is smaller than what must be notified if the
company does not follow work accident insurance |
format |
Theses |
author |
Amaliyah Maryama, Andi |
spellingShingle |
Amaliyah Maryama, Andi RISK MODEL ANALYSIS AND CALCULATION OF PURE PREMIUM ON OCCUPATIONAL SAFETY INSURANCE IN BRIDGE CONSTRUCTION PROJECTS USING GENERALIZED LINIEER MODELS |
author_facet |
Amaliyah Maryama, Andi |
author_sort |
Amaliyah Maryama, Andi |
title |
RISK MODEL ANALYSIS AND CALCULATION OF PURE PREMIUM ON OCCUPATIONAL SAFETY INSURANCE IN BRIDGE CONSTRUCTION PROJECTS USING GENERALIZED LINIEER MODELS |
title_short |
RISK MODEL ANALYSIS AND CALCULATION OF PURE PREMIUM ON OCCUPATIONAL SAFETY INSURANCE IN BRIDGE CONSTRUCTION PROJECTS USING GENERALIZED LINIEER MODELS |
title_full |
RISK MODEL ANALYSIS AND CALCULATION OF PURE PREMIUM ON OCCUPATIONAL SAFETY INSURANCE IN BRIDGE CONSTRUCTION PROJECTS USING GENERALIZED LINIEER MODELS |
title_fullStr |
RISK MODEL ANALYSIS AND CALCULATION OF PURE PREMIUM ON OCCUPATIONAL SAFETY INSURANCE IN BRIDGE CONSTRUCTION PROJECTS USING GENERALIZED LINIEER MODELS |
title_full_unstemmed |
RISK MODEL ANALYSIS AND CALCULATION OF PURE PREMIUM ON OCCUPATIONAL SAFETY INSURANCE IN BRIDGE CONSTRUCTION PROJECTS USING GENERALIZED LINIEER MODELS |
title_sort |
risk model analysis and calculation of pure premium on occupational safety insurance in bridge construction projects using generalized linieer models |
url |
https://digilib.itb.ac.id/gdl/view/54929 |
_version_ |
1822929760367411200 |